Laserfiche WebLink
Rimrock Exploration & Development, Inc. <br />J-Bird Uranium Mine/ DMO/ EPP Quality Assurance/Quality Control <br />16.0 QUALITY ASSURANCE/QUALITY CONTROL <br />Rimrock will notify DRMS in writing, 10 working days prior to construction of the ore <br />stockpile pad, retention basins and construction of Stormwater controls. The ore pad will <br />be constructed using published DRMS General Ore Pad Construction Criteria. A <br />Rimrock engineer experienced in ore pad construction and stormwater controls will be <br />on-site during build-out of these structures. A Rimrock engineer will prepare a post- <br />construction report and submit to DRMS within 60-days of work completion. <br />27