Laserfiche WebLink
CIRCES Cost Estimatinq Software <br />BULLDOZER WORK <br />PROJECT IDENTIFICATION <br />Task # : 06a State : Colorado Permit/job# : P-2008-046 <br />Date <br />User <br />08/18/2009 <br />THM <br />County :Rio Blanco <br />Site :A. M. S. O. Rd&D Project <br />Abbreviation :none <br />Filename :P046-06a <br />Agency or organization name: DRMS <br />Permit or other job action :Final Reclamation Cost Estimate - MD-02 <br />Task description :Establish Final Grade on MWP2 Pad <br />HOURLY EQUIPMENT COST <br />Basic machine : Cat D9R - 9SU (2005) <br />Blade type : Semi-Universal <br />Attachment no. 1 : BOPS Cab <br />Attachment no. 2 : NA <br />Horsepower: 405 <br />Shift basis : 1 per day <br /> Data source: (CRG) <br /> Utilization % - <br />Cost Breakdown : Ownership cost/hour : $58.86 NA <br /> Operating cost/hour : $124.46 100 <br /> Ripper op. cost/hour : $0.00 NA <br /> Operator cost/hour : $35.01 NA <br /> Total unit cost/hour : $218.34 Total fl eet cost/hour : $218.34 <br /> <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 10,000 CCY factor : 1.115 volume : 11,150 LCY <br /> <br />Source of estimated volume: MWP2 Pad Plan <br />Source of estimated swell factor : CAT Handbook <br /> <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br /> Operator skill : 0.75 (avg.) <br /> <br />Average push distance : <br />150 feet <br />Material consistency : <br />1.00 _ <br />(Cat HB) <br />Unadjusted hourly production : 910.5 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility : 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (1 shift/day) <br />Consolidated stockpile Spoil pile: 0.80 (fnd-rf) <br /> Push gradient : 1.11 _ (Cat HB) <br />Average push gradient : 5.00 % (neg) Altitude : 1.00 (Cat HB) <br />Average site altitude : 6,900 feet Material weight : 0.92 (Cat HB) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 2,500 Ibs/LCY Net correction : 0.51 <br />Weight description <br />Clay_ - Dry Adjusted unit production : 465.13 LCY/hr <br /> Adjusted fleet production : 465.13 LCY/hr <br /> <br />JOB TIME AND COST <br />Fleet size : 1 Dozer(s) Total job time : 23.97 Hours <br />Unit cost : $0.469 /LCY Total job cost : $5,234 <br />