My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REVISION - 9/9/2009, 8:10:41 AM-MR1
DRMS
>
Public
>
REVISION - 9/9/2009, 8:10:41 AM-MR1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 11:34:55 AM
Creation date
9/9/2009 8:52:09 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
P2008046
IBM Index Class Name
REVISION
Doc Date
8/31/2009
Doc Name
MD-02 approval
From
DRMS
To
American Shale Oil, LLC
Type & Sequence
MD2
Email Name
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimatinq Software <br />BULLDOZER WORK <br />PROJECT IDENTIFICATION <br />Task # : 05a State :Colorado Permit/job# P-2008-046 <br />Date : 0811812009 County: Rio Blanco Abbreviation :none <br />User : THM Site :A.M.S.O. Rd&D Project Filename :P046-05a <br />Agency or organization name : DRMS <br />Permit or other job action : Final Reclamation Cost Estimate - MD-02 <br />Task description :Establish Final Grade on MWP Pad <br />HOURLY EQUIPMENT COST <br />Basic machine : Cat D9R - 9SU (2005) <br />Blade type : Semi-Universal <br />Attachment no. 1 :ROPS Cab <br />Attachment no. 2 : NA <br />Horsepower: 405 <br />Shiftbasis : 1 per day <br />Data source : (CRG) <br /> Utilization % <br />Cost Breakdown : Ownership cost/hour : $58.86 NA <br /> Operating cost/hour : $124.46 100 <br /> Ripper op. cost/hour : $0.00 NA <br /> Operator cost/hour : $35.01 NA <br /> Total unit cost/hour : $218.34 Total fl eet cost/hour : $218.34 <br /> <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 10,000 CCY factor : 1.115 volume : 11,150 LCY <br /> <br />Source of estimated volume : MWP Pad Plan <br />Source of estimated swell factor : CAT Handbook <br /> <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 100 feet Material consistency : 1.00 _(Cat HB) <br />Unadjusted hourly production : 1,243.2 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility : 1.00 (avg.) _ <br />Material consistency description : Job efficiency : 0.83 (1shift/day) <br />Consolidated stockpile Spoil pile: 0.80 (fnd-rf) <br /> Push gradient : 1.11 (Cat HB) <br />Average push gradient : 5.00 % (neg) Altitude : 1.00 (Cat HB) <br />Average site altitude : 6,900 feet Material weight : 0.92 (Cat HB) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 2,500 Ibs/LCY Net correction : 0.51 <br />Weight description <br />Clay - Dry Adjusted unit production : 635.09 LCY/hr <br /> Adjusted fleet production : 635.09 LCY/hr <br /> <br />JOB TIME AND COST <br />Fleet size : 1 Dozer(s) Total job time : 17.56 Hours <br />Unit cost : $0.344 /LCY Total job cost : $3,833 <br />
The URL can be used to link to this page
Your browser does not support the video tag.