Laserfiche WebLink
CIRCES Cost Estimating Software <br />DIRECT COST SUMMARY FORM <br />TASK LIST (DIRECT COSTS) <br />TASK DESCRIPTION <br />NO FORM <br />USED FLEET <br />SIZE TASK <br />HOURS DIRECT <br />COST <br />. <br /> <br /> <br /> <br />X101 - Direct costs of tasks <br />Backfll West Ash Disposal Site <br />dozer <br />8 <br />94.3 <br />7 <br />$258, 682 <br />659 <br />$519 <br />128 -Cast Blast F Pit dpline highwall (805, 556 cy, table 1.4-2) blasting 1 341. <br />567 <br />3 , <br />745 <br />$777 <br />103 <br />104 -Backfll Pit DIE-no ash <br />-Backrill F Dipline Pit dozer <br />dozer 4 <br />4 . <br />405.6 <br />1 <br />139 , <br />$556,069 <br />372 <br />$205 <br />105 <br />106 -Backfll East F (Z) pit ? <br />-Backrill & grade additional 13.5 acres Z-dip pit (prev. task 901) ? dozer <br />dozer 4 <br />4 . <br />213.6 <br />283 <br />5 , <br />$314,018 <br />$627 <br />699 <br />107 -Backfll Gdip pit (prev. TR96 tasks 130 & 131) dozer 6 . <br />171 <br />2 , <br />806 <br />$234 <br />110 -Backfll & regrade East A pit dozer 4 . , <br />390 <br />$16 <br />112 -Seal 16 boreholes (East panel slide invest. MR212) borehole 1 , <br />445 <br />$804 <br />116 -Backfll & grade N end of East Panel Slide dozer 6 M , <br />416 <br />$57 <br />'7131 -Backrill Ash pit dozer 2 , <br />266 <br />098 <br />$1 <br />127 <br />120 -Cast blast N end pit D <br />-Seed Apit, Range C&B (268.3 ac.) blasting <br />revege 2 <br />1 268.3 , <br />, <br />$168,993 <br />738 <br />64 <br />126 -Seed H-pit, 207.1 acres (77.9 ac. removed due to AP SL7) revege 2 103.5 , <br />$ <br /> <br />129 -Backfill East F (Z) pit highwall (prev. calc. as cast-blast) ? dozer 4 31.9 <br />2 <br />353 $44,146 <br />120 <br />$519 <br />130 -Backfll G dip pit (post-slide) dozer 4 . , <br /> <br />133 <br />117 <br />250 -Seal water monitoring boreholes <br />-Seed D-pit Range A-B <br />-Cast blast G-test pit borehole <br />revege <br />blasting 1 <br />2 <br />1 80.0 <br />310.2 <br />71.1 <br />243 <br />0 $54,739 <br />$433,076 <br />$54,123 <br />115 <br />$306 <br />119 -Seed F-pit Range A-B revege 2 . , <br /> <br />121 <br />122 <br />123 <br /> <br />124 <br />125 <br />134 <br />135 <br />146 <br />147 <br />148 <br />150 <br />134 <br />132 -Seed Z-pit Range A-B <br />-re-seed Cropland <br />-Seed G-pit Range A-B <br /> <br />-Seed C-pit Range C <br />-Seed A-pit Range C <br />-Seal monitoring wells <br />-Regrade Coyote Pond <br />-Regrade Midle Pyeatt#1 pond <br />-Regrade Middle Pyeatt #2 pond <br />-Regrade Middle pyeatt #3 pond <br />-Demolish & dispose of structures <br />-Seal monitoring wells <br />obilization/demobilization of equipment revege <br />revege <br /> <br />vege <br />re <br />revege <br />revege <br />borehole <br />dozer <br />dozer <br />dozer <br />dozer <br />demolish <br />borehole <br />mobilize 2 <br />1 <br /> <br />2 <br />1 <br />1 <br />1 <br />3 <br />1 <br />1 <br />1 <br />4 <br />2 <br />29 199.2 <br />185.5 <br /> <br />150.0 <br />45.1 <br />55.1 <br />80.0 <br />451.5 <br />3.7 <br />5 $251,002 <br />$32,488 <br /> <br />$188,960 <br />$14,098 <br />$17,224 <br />$13,030 <br />$366,791 <br />$1,012 <br /> <br />SUBTOTALS : 6,321.5 $9,155,711