Laserfiche WebLink
Am% <br />amec <br />Earth & Environmental <br />2) VLF, PSSA Haul Road <br />No work performed during the week. <br />3) Sediment Collection Pond <br />No work performed during the week. <br />E) Material Processing <br />1) South Cresson Clay Processing Area <br />Soil Liner Fill production for the VLF continued intermittently at the South Cresson Clay <br />Processing area. Work was suspended due to rain on Thursday and Friday. <br /> <br />Location This Week <br />(tons) Cumulative <br />(tons) Comments <br />So Cresson Clay Processin 2,160 40,291 <br />Squaw Gulch Processing - 35,816 Produced and stockpiled <br />Total 2,160 76,107 <br />F) VLF Miscellaneous Structures <br />One CAT 345 excavator continued to excavate at the planned water storage tank area located <br />southeast of the Phase 5 VLF. Material was hauled using articulating 40-Ton haul trucks to VLF <br />fill areas. <br />III) Underground Working <br />A) Drilling <br />No work performed during the week. <br />B) Mine Shaft/Stope Remediation <br />No work performed during the week. <br />C) Lateral/Slot Remediation <br />No work performed during the week. <br />IV) Storm Water Management Structures <br />A) Control Structures <br />No work performed during the week. <br />B) Best Management Practices <br />Best Management Practices are being observed throughout the VLF Phase 5 Project. <br />V) VLF Geosynthetics <br />No work performed during the week. <br />CQA ACTIVITIES: <br />Sheet 3 of 6 <br />VLF Weekly Report WE 05.23.09.D