My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-09-03_REPORT - M1980244
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2009-09-03_REPORT - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:52:22 PM
Creation date
9/4/2009 7:48:20 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REPORT
Doc Date
9/3/2009
Doc Name
Weekly Construction Quality Assurance ("CQA") Reports- Weeks of 05/10/09 and 05/17/09
From
CC&V
To
DRMS
Type & Sequence
AM9
Email Name
BMK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Am% <br />amec <br />Earth & Environmental <br />2) VLF, PSSA Haul Road <br />No work performed during the week. <br />3) Sediment Collection Pond <br />No work performed during the week. <br />E) Material Processing <br />1) South Cresson Clay Processing Area <br />Soil Liner Fill production for the VLF continued intermittently at the South Cresson Clay <br />Processing area. Work was suspended due to rain on Thursday and Friday. <br /> <br />Location This Week <br />(tons) Cumulative <br />(tons) Comments <br />So Cresson Clay Processin 2,160 40,291 <br />Squaw Gulch Processing - 35,816 Produced and stockpiled <br />Total 2,160 76,107 <br />F) VLF Miscellaneous Structures <br />One CAT 345 excavator continued to excavate at the planned water storage tank area located <br />southeast of the Phase 5 VLF. Material was hauled using articulating 40-Ton haul trucks to VLF <br />fill areas. <br />III) Underground Working <br />A) Drilling <br />No work performed during the week. <br />B) Mine Shaft/Stope Remediation <br />No work performed during the week. <br />C) Lateral/Slot Remediation <br />No work performed during the week. <br />IV) Storm Water Management Structures <br />A) Control Structures <br />No work performed during the week. <br />B) Best Management Practices <br />Best Management Practices are being observed throughout the VLF Phase 5 Project. <br />V) VLF Geosynthetics <br />No work performed during the week. <br />CQA ACTIVITIES: <br />Sheet 3 of 6 <br />VLF Weekly Report WE 05.23.09.D
The URL can be used to link to this page
Your browser does not support the video tag.