My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-09-02_REPORT - M1983102
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1983102
>
2009-09-02_REPORT - M1983102
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/20/2019 10:24:41 AM
Creation date
9/3/2009 9:23:46 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1983102
IBM Index Class Name
REPORT
Doc Date
9/2/2009
Doc Name
Annual Fee/Report/Map
From
Reclamation Ridge, LLC
To
DRMS
Permit Index Doc Type
Annual Fee/Report
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The annual report requirements in the MLRB Rules and <br />Regulations, and the annual review letter are addressed in <br />the following report. Please refer to the 2009 ANNUAL REPORT <br />MAPsubmitted with this text for the locations of the areas <br />discussed. <br />(1) Mining continued on area previously disturbed on the <br />west side of the mine. Approximately 3.02 acres was <br />mined in 2008-2009 (purple). The topsoil is stockpiled <br />in the areas shown on the map (yellow). Between June <br />1, 2009 and August 1, 2009 we imported approximately <br />2,300 yds of topsoil. We estimate there is 11,600 cy <br />stored on the mine in various locations. At the <br />current time we have 26.05 acres ± disturbed in the <br />pit (cross-hatched). Of the total area disturbed at <br />this time 20.42 acres ± is floor area that will become <br />a graded parking area when reclamation is complete <br />(brown & purple); and 0.98 acres ± is partially <br />reclaimed; and 2.21 acres is topsoil stockpile areas <br />(yellow). The remaining 4.38 acres is stripped ready <br />for mining. No mining has taken place in the <br />amendment area. There is adequate soil stockpiled on <br />the site to resoil the disturbed areas to the <br />prescribed depth. The southern topsoil piles have an <br />adequate vegetation cover to prevent erosion and the <br />new piles will be seeded if they remain undisturbed <br />for more that a year. <br />(2) No reclamation was required during this year. Grading <br />and shaping is complete on 0.98 acres on the northeast <br />slope (green). Seeding will take place once we have 5 <br />acres or more that needs seeding. Floor grading will <br />continue on areas not needed by the mine operator for <br />plant site and material stockpiles. We are using the <br />concrete structures left for material storage. <br />(3) Mining will continue on the west side of the Plant <br />Site and work west towards the permit line until that <br />area is day lighted out. Groundwater monitoring will <br />continue as required in the permit. <br />(4) We will continue to mine the original permit area <br />until it is complete and we continue to collect ground <br />water level samples as required in the 2007 Technical <br />Revision.
The URL can be used to link to this page
Your browser does not support the video tag.