Colowyo C-1981-019 <br /> 18 August 2009 <br /> Pg 5/9 <br /> Hydrologic Balance (cont.): - The final 1,000 feet of the Streeter Gulch Ditch was <br /> walked on the inspection. This is the riprapped portion of the ditch that runs along <br /> the north side of the Streeter Fill. The ditch was stable at the time of the inspection <br /> and no erosional problems or undercutting or side-cutting of the riprap was seen. <br /> - Sump 2 contained water and sediment to a level six inches below the top and was <br /> not discharging. The sump was stable at the time of the inspection. <br /> - Sump 3 was dry and contained sediment 1-1/2 feet from the top. The sump will need <br /> to. be cleaned. The sump was stable at the time of the inspection. <br /> - Sump 4 contained some water and sediment six inches below the top and was not <br /> discharging. The sump was stable at the time of the inspection. <br /> - Sump 5 was full but not discharging. The sump was stable at the time of the <br /> inspection. <br /> - The above referenced sumps are BMP's for drainage off of and under the main haul <br /> road. <br /> Backfilling and Grading: - Colowyo was working on the 2009 reclamation block in the <br /> East Pit at the time of the inspection. This area encompasses approximately 34 acres <br /> (see Map 29 - Spoil Grading). The area is the lower-most portion of the Prospect <br /> drainage and is a strip approximately 250-1,000 feet wide and 4,000 feet long. The <br /> area they are working on is split by the lower-most portion of the Prospect Ditch and <br /> includes the lower-most portions of the North Tributary, East Pit Ditch and the Final <br /> East Pit Ditch. Colowyo has completed the Backfilling and grading of the area north <br /> of the North Tributary, East Pit Ditch. The operator has cut contour ditches into the <br /> slope on the south side of the Prospect Ditch but still needs to cut the contour ditches <br /> into the south side of the ditch. Much of this regraded area has been topsoiled (see <br /> the topsoil section below for more details). The operator was actively working on the <br /> portion of the reclamation block south of the North Tributary, East Pit Ditch. The work <br /> they were completing includes bringing the area to final contour, cutting the contour <br /> ditches in and constructing the lower portions of the North Tributary, East Pit Ditch <br /> and the Final East Pit Ditch. They have stockpiled riprap along the top of the <br /> reclamation block for placement in the ditches. Colowyo is scheduled to reclaim <br /> approximately 36 acres of the lower East Pit area (just above the current area) next <br /> year (2010). *See pictures at the end of this inspection regarding the 2009 <br /> reclamation block* <br /> - The 2007 reclamation just to the north of the Prospect ditch has some remaining rills <br /> and some fairly deep and wide gullies (2-3 feet wide and 1-2 feet deep in many <br /> locations). Last month it was noted that these gullies had breached the contour <br /> ditches in several location. Colowyo will need to perform a survey of the rills and <br /> gullies and repair these gullies as needed. These larger gullies will only get deeper <br /> and wider with the rains and snowmelt next spring and will continue breach the <br /> contour ditches and cause problems farther down in the watershed. Colowyo did <br /> repair the contour ditches that were breached but, as mentioned above, they will <br /> breach again during a large rain storm or next spring during the snowmelt and runoff. <br /> *See the pictures at the end of this report for the gullies in the reclamation and the <br /> repaired contour ditches. <br />