Laserfiche WebLink
As a result of this Midterm permit l?e?Ie?v, the performance bond liability for the current permit <br />area pre-la?v and current pragrarn areas} has nat changed and rerrlains at 4,? ?,149.??, As <br />pre??ou1? stated, a full cost estimate re?Iev? ?? currently beln? conducted associated ?v?th Bond <br />Release Application ?-4. The ?'roposed Declslan and F1ndings of ?ampllance for L-? are <br />pending. Ince a east cstln?ate revle Is ?n progress for ?-?, a separate re?ie? will nat be <br />conducted for this Midterm Permit Re?ie?v, The i]ivision finds that the performal?ce bond held is <br />adequate to caper ?eclarnation of the site in accordance with the approved reclamation plan, <br />4