My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-08-18_INSPECTION - M2001085
DRMS
>
Day Forward
>
Inspection
>
Minerals
>
M2001085
>
2009-08-18_INSPECTION - M2001085
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:54:55 PM
Creation date
8/19/2009 1:17:25 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2001085
IBM Index Class Name
INSPECTION
Doc Date
8/18/2009
Doc Name
Insp Rpt
From
DRMS
To
Adams Co RV Park, LLC dba 124th Estate Partners
Inspection Date
8/18/2009
Email Name
DB2
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(Page 3) <br />MINE ID # OR PROSPECTING ID #: M-2001-085 <br />INSPECTION DATE: 18 August 2009 INSPECTOR'S INITIALS: DR? <br />The following problems (PB) and/or possible violations (PV) (and suggested corrective actions) were identified during this <br />inspection. The problems should be corrected by the dates given, or they will become possible violations. The possible <br />violations should be corrected by the dates given to reduce their severity when considered by the Mined Land Reclamation <br />Board. The inspector noted on the previous page should be notified of all corrective actions taken. <br />PROBLEMS/POSSIBLE VIOLATIONS <br />AND <br />CORRECTIVE ACTIONS <br />CORRECTION DATE <br />I'1. Problem: Operator has failed to minimize disturbances to the prevailing hydrologic balance 10/19 /09 <br />of the affected land and of the surrounding area, as required by §34-32.5-116(4)(h) C.R.S. and <br />Rule 3.1.6(1). <br />PB or PV: PB <br />TOPIC(S): E"Ig <br />Corrective Action: Within 60 days of the date of this inspection report. submit an Amendment to the RS <br />Reclamation Plan. in accordance with Rule 1.10.1, to include installation of a clay liner in the a <br />Operator must complete installation of the clay liner no later than 90 days after the design, as <br />described in the Reclamation Plan Amendment, is approved by the Division. <br />2. Problem: Operator is pumping water from the pit without obtaining a renewal of the 9 /18/09 <br />Substitute Water Supply Plan (SWSP) as required by the State Division of Water Resources. <br />PB or PV: PI <br />TOPIC(S): AR
The URL can be used to link to this page
Your browser does not support the video tag.