Laserfiche WebLink
Appendix A <br />TR-105 Reclamation Liability <br />TR-105 - strip 59 acres of topsoil in the K Pit/Horse Gulch areas <br />Reclamation Costs: <br />Source of <br />Description Units Quantity Unit Cost Unit Cost Total Cost <br />Topsoil Replacement cubic yards 111,051 $1.356 Task 8 $ 150,585.31 <br />CIRCES 6/30/09 <br />Revegetation acres 59 $569.60 Task 9 $ 33,606.40 <br />CIRCES 6/30/09 <br />Subtotal <br />$ 184,191.71 <br />Indirect Costs <br />Liability Insurance 2.02% $ 3,720.67 <br />Performance Bond 1.05% $ 1,934.01 <br />Profit 10% <br />$ 18,419.17 <br />Subtotal <br />$ 24,073.86 <br />Total <br />$ 208,265.56 <br />Engineering/contract/bid 4.25% $ 8,851.29 <br />Reclamation Management 5% $ 10,413.28 <br />Subtotal <br />$ 19,264.56 <br />Grand Total <br />Current Liability <br />New Liabililty <br />Bond Amount <br />$ 227,530.13 <br />$20,378,236 <br />$ 20,605,766 <br />$20,606,900