Laserfiche WebLink
sheet 1 of 2 <br />CIRCES Cost Estimating Software <br />• SCRAPER TEAM WORK <br />PROJECT IDENTIFICATION <br />Task #: <br />Date : <br />User: <br />Agency or organization name : Colorado Division Of Reclamation, Mining And Safety <br />070 State : Colorado Permit/job # : C-1981-018 <br />0112712009 County: Rio Blanco Abbreviation :none <br />JDM Site :Deserado Mine Filename :C018-070 <br />Permit or other job action : Renewal 5 <br />Task description : Replace Topsoil from Stockpile to D-Portal Area <br />HOURLY EQUIPMENT COST <br />Shift basis : 1 per day <br />Description <br />0 Cost Bre <br />Scraper work team -Scraper : Cat 637G w/push-pull <br />-Push dozer:NA <br />Support equipment-Load area :NA <br />-Dump area :NA <br />Road maintenance -Motor grader : NA <br />-Water truck : NA <br />akdown : Scraper Work Team <br />Scraper Dozer Support Equipment <br />Load area' Dump area Road Maintenance Equipment <br />Grader Water truck <br />Import data filename : scraper2 NA NA NA NA NA <br />% Utilization-machine : 100 NA NA NA NA NA <br />-Ripper attachment : NA NA NA NA NA NA <br />Ownerhip cost/hour : $110.37 NA NA NA NA NA <br />Operating cost/hour : $177.86 NA NA NA NA NA <br />Ripper op. cost/hour : NA NA NA NA NA NA <br />Operator cost/hour : $24.95 NA NA NA NA NA <br />Unit subtotals : $313.18 NA NA NA NA NA <br />Number of units : 6 0 0 0 0 0 <br />Group subtotals : Work : $1,879.06 Support : $0.00 Maintenance : $0.00 <br />Total work team cost/hour : $1,879.06 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 82,800 CCY factor : 1.111 volume : 91,991 LCY <br />Source of quantity take-off : Permit Volume IV <br />• Source of estimated swell factor :Operator Study