My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-06-18_PERMIT FILE - C1981018A
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981018A
>
2009-06-18_PERMIT FILE - C1981018A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:47:55 PM
Creation date
8/13/2009 1:59:20 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981018A
IBM Index Class Name
Permit File
Doc Date
6/18/2009
Doc Name
Reclamation Cost Estimate
Section_Exhibit Name
Illustration 47
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
146
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Truck/Loader Team Work cont'd Task #: 065 sheet 2 of 2 <br />Loading Tool Cycle Time : Number of loading tool passes required to fill truck : 5 passes <br />Excavators and front shovels -machine cycle time vs. job condition rating : NA <br />- selected value within basic rating : NA <br />Track loaders - material descr.:NA <br />- cycle time elements (min.) : Load <br />NA Maneuver : NA Dump : 0.100 <br />Wheel and track loaders - unadjusted basic loader cycle time ( load, maneuver, and dumr 0.600 minutes <br />Cycle Time Factors Loading Condition Description Factor (min.) Source <br />Material : Mixed material 0.020 (Cat HB) <br />Stockpile : Conveyor or dozer piled 10 ft. high or less 0.010 _(Cat HB) <br />Truck ownership : Common ownership of trucks and loaders -0.040 (Cat HB) <br />Operation : Constant operation -0.040 (Cat HB) <br />Dump target : Nominal target 6.000 (Cat HB) <br />is <br /> Net cycle time aajustment : -v.vov urn 1utaa <br /> Adjusted loader cycle time (total time per loader pass) : 0.550 minutes <br /> Net load time per truck * : 2.300 minutes <br />Truck Cycle Time : • bulk of 1 st loader cycle completed during truck exchange if adj. loader cycle time < exchange time <br />Truck exchange time **: 0.60 minutes........ Adjusted for site altitude : 0.600 minutes <br />Truck load time: 2.300 minutes........ Adjusted for site altitude : 2.300 minutes <br />Truck maneuver and dump time: 1.00 minutes........ Adjusted for site altitude : 1.000 minutes <br />** set at 0 if exchange time < adj. loader cycle time (truck exchange completed during 1st loader cycle) <br />Truck travel (haul & return) time: Road condition : Firm, smooth, rolling, dirt4t. surfaced, watered, maintained <br />Hni it rni A= - <br />Road <br />segment# Haul distance <br />(feet) Grade <br />res. (%) Rolling <br />res. (%) Total <br />resistance (%) Speed <br />(feet/minute) Travel time <br />(minutes) <br />1 2,640 4.00 3.00 7.00 1134 2.399 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Retum mute : Haul time ** : 2.399 minutes <br />minutes <br />minutes <br />• <br />Loading tool unit production : 488.79 LCY/hour...... Adjusted for job efficiency : 405.70 LCY/hour <br />Truck unit production : 203.94 LCY/hour...... Adjusted for job efficiency : 169.27 LCY/hour <br />Optimal no. trucks/loading tool : 2 trucks........... Selected no. trucks/loader : 2 trucks <br /> Adjusted hourly truck team production : 338.53 LCY/hr <br /> Adjusted hourly single truck/loader team production : 338.53 LCY/hr <br /> Adjusted hourly multiple truck/loader team production : 338.53 LCY/hr <br /> <br />JOB TIME AND COST <br />Fleet size : 1 Team(s) Total job time : 4.14 Hours <br />Unit cost : $1.203 /LCY Total job cost : $1,685 <br /> <br />travel time shown for each segment includes acceleration/deceleration adjustment Return time": 0.05Z <br />total haul and return time shown includes altitude adjustment Total truck cycle time : 6.951