My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-06-18_PERMIT FILE - C1981018A
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981018A
>
2009-06-18_PERMIT FILE - C1981018A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:47:55 PM
Creation date
8/13/2009 1:59:20 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981018A
IBM Index Class Name
Permit File
Doc Date
6/18/2009
Doc Name
Reclamation Cost Estimate
Section_Exhibit Name
Illustration 47
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
146
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />• <br />PROJECT IDENTIFICATION <br />Task #: 045 <br />Date : 0112712009 <br />User : JDM <br />Permit/job# : C-1981-018 <br />Abbreviation :none <br />Filename :C018-045 <br />Agency or organization name: Colorado Division Of Reclamation, Minign And Safety <br />Permit or other job action :Renewal 5 <br />Task description : Regrade Pond DP-1 and Explosives Storage Area and Access Road <br />HOURLY EQUIPMENT COST <br />CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />State : Colorado <br />County : Rio Blanco <br />Site: Deserado Mine <br />Basic machine: Cat D9R - 9SU (2005) Horsepower : 405 _ <br />Blade type : Semi-Universal <br />Attachment no. 1 :BOPS Cab Shift basis : 1 per day <br />Attachment no. 2 :3-shank ripper <br /> Data source : (CRG) <br /> <br />Utilization % -------- -- - -- <br />Cost Breakdown : Ownership cost/hour : $71.49 NA <br />Operating cost/hour : $103.27 100 <br />Ripper op. cost/hour : $0.00 0 <br />Operator cost/hour : $32.78 NA <br />Total unit cost/hour : $207.53 Total fleet cost/hour : $830.14 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 28,305 CCY factor : 1.111 volume : 31,447 LCY <br />Source of estimated volume : Permit Volume Iv <br /> <br />Source of estimated swell factor :Operator Study _ <br /> <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br />Average push distance : 200 feet <br />Unadjusted hourly production : 700.0 LCY/hr <br />Material consistency description <br />User provided factor <br />Average push gradient : 5.00 % (I <br />Average site altitude : 5,300 feet <br />Material weight:_ <br />Weight description : <br />USER-PROVIDED WEIGHT DATA <br />Z743 Ibs/LCY <br />Operator skill : 0.75 <br />Material consistency : 0.95 <br />Dozing method : 1.00 <br />Visibility: 1.00 <br />Job efficiency : 0.83 <br />Spoil pile : 0.93 <br />Push gradient : 0.90 <br />Altitude : 1.00 <br />Material weight : 0.84 <br />Blade type : 1.00 <br />Net correction : 0.42 <br />(gen.) <br />(user) <br />Adjusted unit production : 291.57 <br />-I1 Adjusted fleet production : 1,166.28 <br />• JOB TIME AND COST <br />Fleet size <br />4 Dozer(s) <br />Unit cost : $0.712 /LCY <br />LCY/hr <br />Total job time : 26.96 Hours <br />Total job cost : $22,383 <br />LCY/hr
The URL can be used to link to this page
Your browser does not support the video tag.