My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-06-18_PERMIT FILE - C1981018A
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981018A
>
2009-06-18_PERMIT FILE - C1981018A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:47:55 PM
Creation date
8/13/2009 1:59:20 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981018A
IBM Index Class Name
Permit File
Doc Date
6/18/2009
Doc Name
Reclamation Cost Estimate
Section_Exhibit Name
Illustration 47
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
146
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
HOURLY PRODUCTION <br />• Hauling Capacity <br />Scraper Payload (weight) Basis:_ <br />Rated payload : <br />Payload capacity: <br />• <br />sheet 2 of 2 <br />Material weight <br />Material description : <br />USER-PROVIDED WEIGHT DATA <br />Travel time : <br />Road condition description :Firm, smooth, rolling, dirt/lt. surfaced, watered, maintained <br />Haul Route : <br />2,743 pounds/LCY <br />75,000 pounds <br />27.34 LCY <br />Scraper Bowl (volume) Basis : <br />Struck volume : 24.00 LCY <br />Heaped volume : 34.00 LCY <br />Average volume : 29.00 LCY <br />Adjusted capacity: 27.34 LCY <br />hourly production reflects volume per scraper pair on push-pull models <br />Cycle Time : Job Condition Corrections : Site altitude ft): 5,300 <br /> Scraper Push dozer Source <br />Scraper loading time : 1.00 minutes Altitude adj.: 1.000 NA (Cat HB) <br />Maneuver and spread time : 0.60 - minutes Job efficiency : 0.830 NA (Cat HB) <br />` load time per scraper pair on push-pull models Net correction : 0.830 NA <br />Seg. # Haul distance (feet) Grade (%) Roll. res. (%) I Total res. (%) Velocity (fpm) Travel time (min.)" <br />1 1,500 3.00 3.00 6.00 1477 1.10 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Haul time : <br />Return route : 1.10 minutes <br />1 1,500 -3.00 3.00 0.00 2965 0.62 <br /> <br /> <br /> <br /> <br />-------------- <br /> <br /> <br />" travel time for each segment is adjusted for acceleration/decelerabon. Return time : <br />table velocities are max. attainable per total resistance shown, not average <br />Total scraper team cycle time (load + haul + maneuver and spread + return) : <br />Unadjusted unit production/hour : 988.53 LCY/hourAdjusted for job conditions : <br />Optimal number of scrapers per push dozer : NA Selected number of scrapers : <br />Adjusted single scraper team (unit) hourly production : <br />Adjusted multiple scraper team (fleet) hourly production : 0.62 <br /> <br />3.32 <br />820.48 <br />2 <br />820.48 <br />2,461.44 minutes <br /> <br />minutes <br />LCY/hour <br />scraper(s) <br />LCY/hour <br />LCY/hour <br />JOB TIME AND COST <br />• Fleet size : 3 Team(s) Total job time : 24.50 Hours <br />Unit cost : $0.763 /LCY Total job cost : $46,037
The URL can be used to link to this page
Your browser does not support the video tag.