Laserfiche WebLink
• <br />sheet 1 of 2 <br />Description <br />1 per day <br />PROJECT IDENTIFICATION <br />Agency or or( <br />Task # : 025 <br />Date : 0112712009 <br />User : JDM <br />CIRCES Cost Estimatina Software <br />SCRAPER TEAM WORK <br />lanization name : Colorado Division Of Reclamation, Mining And Safety <br />State : Colorado Permit/job # : C-1981-018 <br />County: Rio Blanco Abbreviation :none <br />Site : Deserado Mine Filename : C018-025 <br />Permit or other job action :Renewal 5 <br />Task description : Cover RP 21314 with Subsoil <br />HOURLY EQUIPMENT COST <br />Shift basis : <br />• Cost Bra <br />Scraper work team -Scraper : Cat 637G w/push-pull <br />-Push dozer:NA <br />Support equipment -Load area :INA <br />-Dump area :NA <br />Road maintenance -Motor grader :INA <br />-Water truck :INA - - <br />akdown : Scraper Work Team <br />Scraper Dozer Support Equipment <br />Load area Dump area Road Maintenance Equipment <br />Grader Water truck <br />Import data filename : scraper2 NA NA NA NA NA <br />% Utilization-machine : 100 NA NA NA NA NA <br />-Ripper attachment : NA NA NA NA NA NA <br />Ownerhip cost/hour : $110.37 NA NA NA NA NA <br /> <br />Operating cost/hour : <br />$177.86 <br />NA <br />NA <br />NA <br />NA ------------ <br />NA <br />Ripper op. cost/hour : NA NA NA NA NA NA <br />Operator cost/hour : $24.95 NA NA NA NA NA <br />Unit subtotals : $313.18 NA NA NA NA NA <br />Number of units : 6 0 0 0 0 0 <br />Group subtotals : Work : $1,879.06 Support : $0.00 Maintenance : $0.00 <br />Total work team cost/hour : $1,879.06 <br />Loose <br />volume : 138,057 LCY <br />Source of quantity take-off :Permit Volume IV <br />• Source of estimated swell factor : Operator Study <br />MATERIAL QUANTITIES <br />Initial Swell <br />volume : 124,264 CCY factor : 1.111