Laserfiche WebLink
CIRCES Cost Estimatina Software <br /> BULLDOZER WORK <br /> <br /> PROJECT IDENTIFICATION <br /> Task #: 014 State : Colorado Permit/job# : C-1981-018 <br /> Date : 0112612009 County: Rio Blanco Abbreviation :none <br /> <br />User : JDM <br />Site : Deserado Mine Filename : C018-014 _.-.._-....-.------- <br /> <br /> Agency or organization name : Colorado Division Of Reclamation, Mining And Safety <br /> Permit or other job action :Renewal 5 <br /> Task description : Backfill and Regrade B-Seam Vent Shaft <br /> <br /> HOURLY EQUIPMENT COST <br /> Basic machine : Cat D9R - 9SU (2005) Horsepower : 405 <br />_ ................. .......... .--- <br /> Blade type : Semi-Universal <br /> Attachment no. 1 : ROPS Cab Shift basis : 1 per day <br /> Attachment no. 2:3-shank ripper <br /> Data source : (CRG) <br /> Utilization % <br /> Cost Breakdown : Ownership cost/hour : <br />$71.49 NA <br /> _ <br />Operating cost/hour : $103.27 100 <br /> Ripper op. cost/hour : $0.00 0 <br /> Operator cost/hour : $32.78 NA <br /> Total unit cost/hour : $207.53 Total fleet cost/hour : $830.14 <br /> MATERIAL QUANTITIES <br /> Initial Swell Loose <br /> volume : 2736 CCY factor: volume : 3,040 LCY <br /> <br /> Source of estimated volume: Division Estimate <br /> Source of estimated swell factor :Operator Study <br /> <br /> HOURLY PRODUCTION Job Condition Correction Factors Source <br /> Operator skill : 0.75 (avg.) <br /> Average push distance : 100 feet Material consistency : 0.95 (user) <br /> Unadjusted hourly production : 1,243.2 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility: 1.00 (avg.) <br /> Material consistency description : Job efficiency : 0.83 (1shift1day)- <br /> User provided factor Spoil pile : 0.93 (user) _ <br /> Push gradient : 0.67 (Cat HB) <br /> <br />Average push gradient : <br />15.00 0 (pos) <br />Altitude : <br />1.00 _ <br />(Cat HB) <br /> Average site altitude : 5,300 feet Material weight : 0.84 (user) <br /> Blade type : 1.00 (S/SU/U) <br /> Material weight : 2,743 Ibs/LCY Net correction : 0.31 <br />Weight description <br />USER-PROVIDED WEIGHT DATA <br />JOB TIME AND COST <br />• Fleet size : 4 Dozer(s) <br />Unit cost : $0.543 /LCY <br />Adjusted unit production : 382.06 LCY/hr <br />Adjusted fleet production : 1,528.23 LCY/hr <br />Total job time <br />Total job cost : <br />1.99 Hours <br />$1,651