FROM :
<br />FRX NO. : 17198414975 Feb. 15 2007 04:51PM P4
<br />' U. S. DEPT. OF THE INTERIOR
<br />OFFICE OF SURFACE
<br />Mine Site Evacuation. State Program
<br />Permittee/ Permit Field Visit 021p6/2007 Continuation Page
<br />Person BASIN RESOLIRCES, INC. Number t"'013 -$1 Date
<br />28. Performance Standard Categories
<br />nee, 3 =Not Planned, 4--Not Started, S=NonoompliData ldentiried E sewhere, 6= 11reviously Cited
<br />0
<br />D,
<br />E.
<br />F.
<br />G.
<br />Backirilling & Grading
<br />I.- Exposed Openings
<br />2, Contemporaneous Reclamation
<br />3 - Approximate Original Contour
<br />4._ T•iighwall Elimination
<br />5• Steep Slopes (includes dowitslope)
<br />6.- Handling of Acid & Toxic Materials
<br />7, Stabilization (rllls and gullies)
<br />Excess Spoil Disposal
<br />1 Placement
<br />2,_Drainage Control
<br />3. Surface Stabilization
<br />4:-Inspections & Certifications
<br />Coal Mine Waste
<br />(Refuse Mies/Xmpoundments)
<br />1._Drainage Control
<br />2. Surface Stabilization
<br />3 Placement
<br />4,` Inspections and Certifications
<br />5._ Impounding Structures
<br />Use Of Explosives
<br />1. Blaster Certification
<br />20 Distance Prohibitions
<br />3._ Blast survey /Schedule
<br />4, Warnings & Records
<br />5. Control of Adverse Bffe=
<br />Ii. 2 Subsidence Control plan
<br />1. Roads
<br />I. , Road Constructioh
<br />2 Certification
<br />3. Drainage
<br />4.- Surfacing and Maintenance
<br />5. Reclamation
<br />J. Signs & Markers
<br />I. Signs
<br />2,_ Markers
<br />Y- _Distance Prohibitions
<br />L. Revegetation
<br />I. Vegetative Cover
<br />21 Tinting
<br />N1. Postminiag Land Use
<br />N. Other
<br />Genera(
<br />Performance
<br />Catagory
<br />H 2 1), Fail ' 0 to compensate the
<br />- - I,)-
<br />Performance Standard Catagories E
<br />fl.
<br />M»liiig within Valid Permit
<br />1. Placcinen ........................................................ ..........................71(e)
<br />2. -"
<br />Mining within Bonded Area
<br />71(
<br />3.
<br />Terms & Conditions ofPermit
<br />4. Liability Insurance ........... .................... ............I.................. $00.60 1
<br />4.
<br />Liability Insurance
<br />........................»......_........ .
<br />5.
<br />Ownership and Control
<br />5- Impounding Structures .................................. ».......... .....,....,.,,.,......... »..ti4
<br />6.
<br />- Temporary Cessation
<br />1. Drainage Control............ ................•......,........ .............................45
<br />z Inspections & Certifications .............. . .... __ ........... :.• -...- .49(a }(10} l
<br />7. 1Rm, Fees -- Non- Respondent
<br />» ».. ....6
<br />8.
<br />-AML
<br />AML Rec. Fees - Failure to 'Pay
<br />......._.......... 62 -64
<br />B. Hyd_ rologle Balance
<br />......................_».......... ............•................ »
<br />I .T
<br />Drainage Contro1
<br />2,
<br />. Inspections & Certifications
<br />3
<br />Siltation Structures
<br />4,= Discharge Structures
<br />5.
<br />Diversions
<br />6- ,�
<br />Effluent Limits
<br />7."T
<br />Ground Water Monitoring
<br />8.
<br />- Surface Water Monitoring
<br />9.-
<br />Drainage) - Acid -Toxic Materials
<br />10.
<br />- Impoundments
<br />11
<br />Stream Buffer zones
<br />•
<br />_
<br />C. Topsoil & Subsoil
<br />I.-
<br />Removal
<br />2.
<br />Substitute Materials
<br />Storage and Protection
<br />0
<br />D,
<br />E.
<br />F.
<br />G.
<br />Backirilling & Grading
<br />I.- Exposed Openings
<br />2, Contemporaneous Reclamation
<br />3 - Approximate Original Contour
<br />4._ T•iighwall Elimination
<br />5• Steep Slopes (includes dowitslope)
<br />6.- Handling of Acid & Toxic Materials
<br />7, Stabilization (rllls and gullies)
<br />Excess Spoil Disposal
<br />1 Placement
<br />2,_Drainage Control
<br />3. Surface Stabilization
<br />4:-Inspections & Certifications
<br />Coal Mine Waste
<br />(Refuse Mies/Xmpoundments)
<br />1._Drainage Control
<br />2. Surface Stabilization
<br />3 Placement
<br />4,` Inspections and Certifications
<br />5._ Impounding Structures
<br />Use Of Explosives
<br />1. Blaster Certification
<br />20 Distance Prohibitions
<br />3._ Blast survey /Schedule
<br />4, Warnings & Records
<br />5. Control of Adverse Bffe=
<br />Ii. 2 Subsidence Control plan
<br />1. Roads
<br />I. , Road Constructioh
<br />2 Certification
<br />3. Drainage
<br />4.- Surfacing and Maintenance
<br />5. Reclamation
<br />J. Signs & Markers
<br />I. Signs
<br />2,_ Markers
<br />Y- _Distance Prohibitions
<br />L. Revegetation
<br />I. Vegetative Cover
<br />21 Tinting
<br />N1. Postminiag Land Use
<br />N. Other
<br />Genera(
<br />Performance
<br />Catagory
<br />H 2 1), Fail ' 0 to compensate the
<br />- - I,)-
<br />Performance Standard Catagories E
<br />E. Excess Spoil Disposal ......... ... ... ........................ -(8161817.71 -74)'
<br />30 M' Counterpart 1
<br />1. Placcinen ........................................................ ..........................71(e)
<br />I. Valid Permit , ... _....... - . . ............_................• .....,...................773.11 3
<br />4. Ins lions & Certifications ...................._........................................ 7
<br />71(
<br />2. Mining within Bonded Area......_ ................... . ....................773.1 ] P
<br />F Coal Mine W&Ste (fuse Piles/lmpuund,nents) .....(8161817.81 -84)
<br />4. Liability Insurance ........... .................... ............I.................. $00.60 1
<br />1. Drainage Control .....,.....,..........,........... .................,..,......:... ».......... 83(a)
<br />6. Temporary Ccssation.., _ ..................... 842.11(0) &816 /817]31 3
<br />........................»......_........ .
<br />».._. ..:_.._....,83(x3
<br />8. AMLRcc. Fees-• FailurctoPa y._..» ... . ..............._...._870.t5(a) 5
<br />5- Impounding Structures .................................. ».......... .....,....,.,,.,......... »..ti4
<br />D. ) RydrologicBelance ..................... .................(816 /817.41x7) C
<br />C. Use of Explosives ... .. ..... .. ........ .. .... .. ...................... (8161817.61 -68)
<br />1. Drainage Control............ ................•......,........ .............................45
<br />z Inspections & Certifications .............. . .... __ ........... :.• -...- .49(a }(10} l
<br />l_ Blaster Cep ............ »
<br />» ».. ....6
<br />3. Siltation Structures ............ .. ..... _ ............ ..... .•,....... ................... 46 3
<br />». » » ». .
<br />......._.......... 62 -64
<br />4. Discharge Structures ..... ................ .
<br />......................_».......... ............•................ »
<br />»66&G8
<br />...... .
<br />
|