My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-05-09_ENFORCEMENT - C1981013
DRMS
>
Day Forward
>
Enforcement
>
Coal
>
C1981013
>
2007-05-09_ENFORCEMENT - C1981013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:16:51 PM
Creation date
8/7/2009 4:21:22 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981013
IBM Index Class Name
Enforcement
Doc Date
5/9/2007
Doc Name
Presentation and Exhibits of Basin Resources, Inc. to MLRB
From
Davis Graham & Stubbs
To
MLRB
Violation No.
CV2007001
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
90
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FROM : <br />FAX NO. : 17198464975 Feb. 15 2007 04:51PM P3 <br />R U. S. -DEPT. OF THE INTERIOR. <br />OFFICE OF SURFACE MINING <br />y Mine Site Evaluation <br />State Program <br />1. PermitteeTorson <br />13ASTN RESOURCES, INC. <br />2. Address <br />34115 COUNTY ROAD 20.8 <br />3. City 4. State <br />Trinidad CO <br />5, Zip Code 6. Phone Nurrtber <br />81082 (719) 846-242' <br />7. OpemtorName, if Different thanPermittee, <br />S. Mira; Name <br />GOLDEN EAGLE MINE <br />25. Hours <br />g,0 a. Permit Review <br />O.0 b. Site Visit Time <br />O,p c. Travel Time <br />2.0 d. Report Writing <br />9. Permit Number <br />10, Permit'lype <br />C- 013 -81 <br />)'P <br />11, Field Visit Date <br />12. purpose <br />13. SPA Present <br />UZ/06/2007 <br />CC <br />N� <br />mm -dd .YYYY <br />14. P=ait Status <br />15. Site Status <br />16.. Facility TypType <br />.IN <br />T2 <br />17. OSM Office # <br />AS. CCID # <br />19. Land Code <br />140 <br />GC07- yap -out <br />STS <br />20. M.S.I1A ID # <br />21. State Abrev. <br />22. County Mms <br />C -02$38 71 <br />CO <br />LAS AN 1 <br />23, <br />AVS Permittee <br />Entity TD Number <br />24. State Office <br />O5G887 <br />26. Sit nature Sleek <br />L "-166 <br />Sim T6 : <br />H(ENR'Y AUSTIN ID # 116 <br />Printed Name; <br />Date: 02106/x007 <br />27. Reviewitn Official: <br />Signature: <br />Review Date: I q / & / 2dd"7 <br />mm - dd - yyyy <br />Is Supplemental MSE Page Used YIN FY <br />Permit Type Item 10 IP - Interim Program, PP = Permanent Program , NP = No Permit <br />Purpose Type Codes Item 12 CCR... Citizen Complaint Refers) (ncn site visit) <br />OM, ,Oversight RFx.... Reclamation Fees CC__ Citizen Complaint (initial site visit) <br />Axc... Assistance Fxx., , Federal Actions CCF .... Citfzen Complaint Follow-up - <br />Joint inspection -- lWm 13 A joint inspection is when a state inspector accompanies an OSM inspector anytime during the review of the mine site. <br />Permit Status— Item 14 - AS .... Abandoned: All surface and underground coal mining activities have ceased and <br />operator has left the site without completing reclamation as defined in <br />A.... Active: Coal mining and reclamation acfivittes occurring or 30 CFR 840.11(9) <br />pmanitted but not yet disturbed. A61..Bond Forfeiture: Bond forfeiture officially in process or completed, and. <br />IN .... inactive (Permanent Program Permit): Phase 11 completed or reclamation in progress or not yet commenced. <br />Temporary Cessation of Operations. (interim Program Permit) A$2 „partially Reclaimed Forfeiture: Forfeited sits where all bonds have been <br />Coal mining completed and reclamation activities initiated. used to reclaim site, but site not reciaimed to Program standards. <br />RR...Bond Release; Reclamation completed and State Regulatory A83..Reclalmed Forfeiture: Forfeited site that has been reclaimed to Progrem standards <br />Authority (RA) has released all of the bond (Phase!!! Release.) NA ... Not Applicable: When site is unpermitted. <br />Site Status Codes -- item 15 NS.. Non -Site Visit: Status of site not determined <br />'ND.. No Disturbance: No coal mining and reclamation MC..Mining Complete: No mining activity on site, FP.. Forfeiture Pending: The RA Is pursuing <br />operations have been started. site regraded and awaiting phase bond release, actions to revoke the permit, collect the <br />EX.. Coal F- Vioration: Coal exploration operations TC..'remporary Cessation.,me RA has granted _ pperformanca bond(s), andlor reclama- <br />have started and where coal mining operations cessation of mining pursuant to 30 GFR 8161 tion of forfeited site is in progress. <br />817131(b) FR.. Forfeited and Reclaimed; Forfeiture <br />have not beau". <br />AP.. Active Coal*Producing: Coal surface mining P1 ... Phase I Release; At least Phase I bond release reclamation completed. <br />activities are occurring. granted for entire permitted area For interim Fo,, abandoned Site• Abandoned site that <br />AN.. Active Non - Producing: Active non - producing permits, partial bond release. is permitted but there is no bond. <br />facility such as tipple or. preparation ,plant. P2.. Phase Il Release; At least Phase Il bond releaseWC.yvildcat: Coal mining and reclamation <br />NM -No Mining; The Permit Status is active, site is forthe entire permitted area. operations have or are taking place and <br />not In Temaorary Cessation, no surface coal P3.. Phase 111 Release. Reclamation completed and the activity is not cvvered X the <br />Facility Typo Codes— item 16 D ... Anciliary (Hauiroad, Conveyor. and /or Rails) H ..Exploration Permits ^~ L... Rerninine site permitted <br />A... Surface E ... Refuse and /or Impoundment L.. Notice of Intentto Ekpfore under3 CFR785.25 <br />0 B... Underground F... Loading Facility and /or Tipple J... Exempt 16 and = <br />C... Preparation Plant G.-Stockpiles K..Govemment Financed Construction Exemption <br />Small Business Regulatory Enforcement Fairness Act (SSREFA) <br />Your Comments Are Important <br />Tlie Small Pouincss and Agriculture RegulMory Enforcement Ornbudsm ?n and 10 Regional Pairrless Boards were estaNichccl to receive commenl5 from <br />smail businesses about TCdaral agency oforocment actions. The Ombudsman will annually evsluate the enfioreemyent activities and toe tach a2i ncv's <br />. ,„ ... ;.... Tf unti nrF A STAR hil -4ni -M (a hiatinLeRk With 500 or fewer =1)1OVCes including. those o a iliateS) I p.,tiP 1 p <br />
The URL can be used to link to this page
Your browser does not support the video tag.