? Reclamation Plan Requirements [3809.401(b)(3)] <br />• Additional details on wildlife habitat rehabilitation, as applicable <br />• Provisions for post-closure management, as applicable <br />? Interim Management Plan [3809.401(b)(5)] <br />• Measures to stabilize excavations and workings <br />• Measures to isolate or control toxic or deleterious materials <br />• Plan for storage or removal of equipment, supplies and structures <br />• Measures to maintain the area in a safe and clean condition <br />• Plans for monitoring site conditions during non-operation <br />• A schedule of anticipated non-operation and submittal process <br />• Provisions to notify BLM of changes in non-operation period <br />? Reclamation Cost Estimate [3809.401(d)] <br />In addition, we have initiated an Environmental Assessment, in accordance with the requirements <br />under the National Environmental Policy Act (NEPA). It is anticipated that this effort will take a <br />minimum of 45-days to complete, once this office has determined that the mining plan of operations <br />is complete. The final outcome of this assessment will be submitted to CDRMS and incorporated into <br />their permit issuance process. <br />We have created a case file for this operation under our 43 CFR 3809 regulations and have included <br />this recently submitted information in the file. If you have, any questions please contact Stephanie <br />Carter or Melissa Smeins of my staff at (719) 269-8551 or (719) 269-8523, respectively. <br />Sincerely, <br />Linda Mcglothlen <br />Field Manager <br />Royal Gorge Field Office <br />Cc: David Byrd <br />Colorado Division of Reclamation, Mining, and Safety <br />Room 215 <br />1313 Sherman St. <br />Denver, CO 80203