My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-08-06_PERMIT FILE - M2009056
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2009056
>
2009-08-06_PERMIT FILE - M2009056
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:49:28 PM
Creation date
8/7/2009 9:01:58 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2009056
IBM Index Class Name
PERMIT FILE
Doc Date
8/6/2009
Doc Name
Review
From
BLM
To
Destiny Mining, LLC
Email Name
DB2
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
United States Department of the Interior <br />Bureau of Land Mana ement w! <br />-- g TAKE F?Fti???' <br />3028 East Main Street IN AMERICA <br />Canon City, Colorado 81212 <br />"AUG 0 4 2009 <br />Boyd Astemborski <br />Destiny Mining, LLC <br />P.O. Box 51314 <br />Colorado Springs, CO 80949 <br />Dear Mr. Astemborski, <br /> <br />PAG G 6 2009 <br />DK4sisn of Reclamation, <br />Mining and Safety <br />We received a copy of your Colorado Division of Reclamation, Mining and Safety (CDRMS) 110(2) <br />application on July 27, 2009 for proposed hardrock/metal mining activities in Township 9 South, <br />Range 77 West, Section 33. This information is required to be reviewed by our office for <br />completeness within 30-days of receipt. Z7 <br />In reviewing this submittal, we have determined that additional information is needed to adequately <br />meet requirements for a mining plan of operations, as outlined in the 43 CFR 3809 regulations. <br />Therefore, this letter is being issued within the allotted timeframe, in order to request further <br />information and clarification on this proposed mining plan of operations. Below is an itemized list of <br />the noted deficiencies: <br />? Operator Information Requirements [3809.401(b)(1)] <br />• The taxpayer identification number <br />? Description of Operations Elements [3809:401(b)(2)] <br />• Preliminary/conceptual designs, cross-sections and operating plans <br />• A Quality Assurance Plan for operations related to monitoring, documentation, sampling, <br />etc. <br />• Additional details to support a spill contingency plan for the fueling operations that will <br />take place onsite <br />• Additional details on the expected long term schedule of operations <br />In Reply Refer to: <br />COC-073930 <br />(C0200) SC <br />0 Plans for bringing power to the site
The URL can be used to link to this page
Your browser does not support the video tag.