My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-08-06_REVISION - C1982056 (2)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1982056
>
2009-08-06_REVISION - C1982056 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:49:30 PM
Creation date
8/6/2009 2:33:25 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982056
IBM Index Class Name
REVISION
Doc Date
8/6/2009
Doc Name
Expansion Adequacy Concerns & Attached Cost Estimate
From
DRMS
To
Twentymile Coal Company
Type & Sequence
TR67
Email Name
JHB
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
HOURLY PRODUCTION <br />Hauling Capacity : <br />Scraper Payload (weight) Basis : <br />sheet 2 of 2 <br />Material weight : 2,550 pounds/LCY <br />Material description <br />Earth - Dry packed <br />Rated payload : 104,000 pounds <br />Payload capacity: 40.78 LCY <br />Cycle Time : <br />Scraper loading time * : 1.10 minutes <br />Maneuver and spread time : 0.60 minutes <br />* load time per scraper pair on push-pull models <br />Travel time : <br />Road condition description :Firm, smooth, rolling <br />Haul Route : <br />Scraper Bowl (volume) Basis : <br />Struck volume : 32.00 LCY <br />Heaped volume : 44.00 LCY <br />Average volume : 38.00 LCY <br />Adjusted capacity : 38.00 LCY "** <br />hourly production reflects volume per scraper pair on push-pull models <br /> Job Condition Corrections : Site altitude (ft.) : 7,000 <br /> Scraper Push dozer Source <br /> Altitude adj.: 1.000 NA (Cat HB) <br /> Job efficiency : 0.830 NA (Cat HB) <br />Net correction : 0.830 NA <br />dirtIlt. surfaced, watered, maintained <br />Seg. # Haul distance (feet) Grade (%) Roll. res. (%) Total res. (%) Velocity (fpm) Travel time (min.)** <br />1 1,200 2.70 3.00 5.70 1908 0.79 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Return route : <br />Haul time <br />travel time for each segment is adjusted for acceleration/deceleration. Return time <br />table velocities are max. attainable per total resistance shown, not average <br />Total scraper team cycle time (load + haul + maneuver and spread + return) <br />Unadjusted unit production/hour : 1,518.02 LCY/hour *** Adjusted for job conditions <br />Optimal number of scrapers per push dozer : NA Selected number of scrapers <br />Adjusted single scraper team (unit) hourly production <br />Adjusted multiple scraper team (fleet) hourly production <br />0.79 <br />0.51 minutes <br />0.51 minutes <br />3.00 minutes <br />1,259.96 LCY/hour <br />2 scraper(s) <br />1,259.96 LCY/hour <br />3,779.87 LCY/hour <br />Total job time : 92.18 Hours <br />Total job cost : $268,763
The URL can be used to link to this page
Your browser does not support the video tag.