Laserfiche WebLink
sheet 1 of 2 <br />CIRCES Cost Estimating Software <br />SCRAPER TEAM WORK <br />PROJECT IDENTIFICATION <br />Agency or organization name : Colorado Division Of Reclamation, Mining And Safety <br />Task #: 67B State : Colorado Permit/job #: C1982056 <br />Date : 0713112009 County:Routt Abbreviation :none <br />User: JHB Site : Foidel Creek Mine Filename : C056-67B <br />Permit or other job action : Tr67 <br />Task description :Replace topsoil on CRDA expansion <br />HOURLY EQUIPMENT COST <br />Shift basis : 1 per day <br />(Equipment Description <br />Cost Bre <br />Scraper work team -Scraper :(Cat 657E w/push pull <br />-Push dozer :INA <br />Support equipment -Load area : NA <br />-Dump area : Cat D10R - 10SU (2005) <br />Road maintenance -Motor grader :(CAT 140H <br />-Water truck :I Water Tanker, 5,000 Gal. <br />akdown : Scraper Work Team <br />Scraper Dozer Support Equipment <br />Load area Dump area Road Maintenance Equipment <br />Grader Water truck <br />Import data filename : scraper2 NA NA dozer grader misctruk <br />% Utilization-machine : 100 NA NA 100 25 25 <br />-Ripper attachment : NA NA NA NA NA NA <br />Ownerhip cost/hour : $120.13 NA NA $79.90 $28.49 $22.75 <br />Operating cost/hour : $265.70 NA NA $169.20 $11.97 $11.03 <br />Ripper op. cost/hour : NA NA NA $0.00 $0.00 NA <br />Operator cost/hour : $30.01 NA NA $35.01 $28.49 $33.94 <br />Unit subtotals : $415.83 NA NA $284.12 $68.94 $67.72 <br />Number of units : 6 0 0 1 1 1 <br />Group subtotals : Work : $2,494.98 Support: $284.12 Maintenance : $136.66 <br />Total work team cost/hour : $2,915.76 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 309,700 CCY factor : 1.125 volume : 348,412 LCY <br />Source of quantity take-off :permit p. 2.05-97.3 <br />Source of estimated swell factor : caterpillar handbook