My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-03-06_PERMIT FILE - C1981012A (3)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981012
>
2009-03-06_PERMIT FILE - C1981012A (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:44:10 PM
Creation date
8/4/2009 10:45:29 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981012A
IBM Index Class Name
Permit File
Doc Date
3/6/2009
Section_Exhibit Name
Section 2.05 Operation and Reclamation Plan
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
118
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TABLE 19 -SURFACE FACILITIES LIST <br /> East Portal (Map 11) <br /> Pump House to Water Tanks Electrical House <br /> Walkway Tunnel Loadout Belt Building <br />"* Warehouse #2 Thickener Pump House <br />*" Warehouse #3 Pad '' Acid Tank <br /> Coal Lab Fuel Tank Containment Sumps (2) <br /> Ambulance Garage Antifreese Tank Sump <br /> East Portal Fan Stacking Tubes (2) <br /> Oil House Water Pump House Tank <br /> Industrial Building Scale <br /> Hoist House Raw Coal Stockpile Areas #1 & 2 <br /> Transfer Building ** Raw Coal Stockpile Areas # 3 & 4 <br /> Breaker Building Clean Coal Stockpile <br /> Water Tanks (2) Topsoil Stockpile Areas <br /> Transfer Conveyor Belt Non-Coal Storage Area <br /> Raw Coal Conveyor Belt Development Coal-Waste Pile <br /> Clean Coal Reclaim Conveyor Refuse Disposal Area <br /> Clean Coal Plant Conveyor Bio-Remediation Storage Site <br />" Refuse Conveyor Sparge/VES Remediation System <br />" Truck Dump Conveyor Refuse Disposal Slurry Lines <br /> Silo Loadout Belt Rail Car and Refuse Belt De-icer <br /> Transfer to Loadout Belt Slope Structure <br />" Raw Coal Reclaim Tunnel Truck Dump <br /> Clean Coal Reclaim Tunnel Roads <br /> Coal Storage Silos (2) Ponds w/Embankments and Outlet Works <br /> Sewage Treatment Plant Ditches and Culverts <br /> River Crossing Bridges (3) '' Power Line to Plant Substation <br />" Prep Plant '' Power Line to RDA Substation <br />'` Thickener Power Line to Loadout Substation <br />" Plant Substation Vertical Turbine Mine Dewatering Pumps (2) <br /> Refuse Substation Power Line to Dewatering Pumps <br /> East Portal Substation Water Line from Dewater Pumps to Pond #1 <br /> Loadout Substation <br /> Thickener Substation <br />West Portal (Map 12) <br />'`" Hoist House *` Cap House <br />"* Warehouse #1 w/Walkway Tunnel ** Core House <br />" Garage/Oil House Fan Shaft <br />*' Pump House Non-Coal Disposal Area <br />"" Powder House <br />'' Post-Law Facilities Constructed after August 3, 1977. <br />"' Phase I Released <br />Removed from Site (italics) <br />M~~~ 2.05-7 (Revised 8/22/08) <br />
The URL can be used to link to this page
Your browser does not support the video tag.