Laserfiche WebLink
Table 60 <br />TOPSOIL REPLACEMENT - <br />N0. 9 PORTAL AND GENERAL AREA,(1) WASTE DISPOSAL PILE <br />Topsoil <br /> <br />Location Stockpiles <br />yd3 <br />stored Topsoil to be <br /> <br />Site Replaced <br /> <br />Acreage <br /> <br />Depth <br />NE of Refuse Pile 6,687 Refuse Pile 27.0 6-12"(2) <br />NW of Refuse Pile 12,246 <br />E of Refuse Pile 100,308 <br />(Subsoil) <br />No. 9 Berm 41,000 No. 9 Portal and 33.6 6-12" <br /> General Area <br /> NE of Pond 9-P6 150 <br /> NW of Pond 9-P4 150 <br />• S of Pond 9-P5 150 <br />(1) Includes Electrician's Shop <br />(2) 43,560 yd3 of material needed to provide 1 foot of material over <br />refuse. 18,933 yd3 available from topsoil stockpile, remainder of plant <br />growth material will be obtained from subsoil stockpile east of refuse <br />pile. <br />• <br />