Laserfiche WebLink
PAR RESPONSE <br />Table 59 <br />TOPSOIL REPLACEMENT - <br />N0. 5A PORTAL AND GENERAL AREA*, OLD SHOP, CARPENTER SHOP <br />Topsoil <br /> <br />Location Stockpiles <br />yda <br />stored Topsoil <br /> <br />Site to be Replaced <br /> <br />Acreage <br /> <br />Depth <br />5A Portal 0 5A Portal 22 (1) <br /> Ponds 5A-P2&3 4.5 (1) <br />Adjacent to SH-P1 180* Old Shop 9 (2) <br />Adjacent to SH-P2 240* Old Shop <br />Temporary Of fice 39 Temporary Office (3) <br />NOTES <br />* General Area includes all the disturbed area including sediment <br />control systems. <br />** Topsoil salvage from construction of sediment control system and it <br />• will be reapplied to those systems. <br />(1) Overburden will be used as a plant growth media as per the <br />requirements established during the overburden testing. <br />(2) The salvaged topsoil will be redistributed over the pond areas and <br />overburden will be used as the plant growth media for the remainder <br />of the site. <br />(3) The topsoil was salvaged from the eastern end of the parking lot <br />and will be redistributed to a depth of 6" over this area. The <br />existing soils will be used as a plant growth media for the <br />remainder of the area. <br />Any overburden or soil materials to be used will be sampled for <br />fertility and the appropriate amendments added. <br /> <br />