48-inch Overland Conveyor - The 48-inch Overland Conveyor was constructed in 1985 to allow coal to be transported <br />from the No. 5A Portals to the coal handling facility. The main obstacles in constructing the Overland Conveyor <br />were; 1) Gaining permission from the CMLRD to come within 100 feet of a stream (namely, the Williams Fork <br />River); and 2) Gaining approval from the State Highway Department to cross State Highway 13. Since no <br />environmental harm would come to the Williams Fork River, the CMLRD approved construction of the Overland <br />Conveyor in 1985; and the Highway Department approved construction across State Highway 13 in the same year. <br />Documentation of State Highway approval is presented in Exhibit 19, Overland Conveyor Highway Crossing <br />Approval. The Overland Conveyor is covered for dust control and has been included in the RAG EC Air Emission <br />Permit. A copy of the Air Emission Permit from the Colorado State Department of Health is included in Exhibit 2, <br />Other Required Permits. The 48-inch Overland Conveyor terminates at the coal Stacking Tube. <br />Stacking Tube - The Stacking Tube is approximately 85 feet in height and 12 feet in diameter. Coal passes through <br />the Stacking Tube to the 100,000 ton Raw Coal Stockpile. <br />Primary Raw Coal Stockpile - The coal stockpile is designed to accommodate over 210,000 tons of run-of mine <br />coal. The basal area of the stockpile storage area is approximately 210,000 square feet. The stockpile was <br />constructed on a previously disturbed area, and as such, no topsoil was salvaged. Typically, approximately 60,000 <br />tons of coal will be stored in the stockpile. The maximum capacity will be used only at times when coal production <br />exceeds delivery schedules. Usually, this will occur when the longwall system is being moved to begin another <br />longwall panel, or trains are delayed. The CDOH air emission permit will dictate the maximum tonnage in the coal <br />pile and DMG approved footprint. <br />30,000 Ton Raw Coal Stockpile - The coal stockpile was designed to accommodate 30,000 tons of run-of-mined coal. <br />It was located in the No. 9 Mine portal area. This coal was trucked from the primary Raw Coal Stockpile or 5A <br />Portals. This is low-quality coal, which was stored prior to blending, when conditions allowed. <br />Reclaim Tunnel and 42-Inch Conveyor - A reclaim tunnel is located beneath the coal stockpile and the associated <br />conveyor is used to transport the coal from the coal stockpile to the Screening and Sizing Building. <br />Screening and Sizing Building - The Screening and Sizing Building is used to screen and size the coal. Included in <br />the building are screens, a rotary breaker, and associated conveyor belts. In the Screening and Sizing Building, coarse <br />reject is separated from the coal and then hauled by truck to the waste disposal site. Screened and sized coal is then <br />transferred to the 36-inch Overland Conveyor. <br />36-inch Overland Conveyor - The 36-inch overland conveyor transports the coal to the sample building. Coal samples <br />are taken at the sample building for quality control. <br />Raw Coal Storage Conveyor - The Raw Coal Storage Conveyor is an inclined conveyor, which transports the coal to <br />the 10,000 ton Storage Silo from the sample building. <br />10,000 Ton Storage Silo - The 10,000 ton Storage Silo is used to feed coal to unit trains. The unit-trains then haul the <br />coal to market. Due to the fact that the Storage Silo is a very important part of the coal handling operation, and that <br />underground mining had been conducted immediately beneath the storage silo area, a stability analysis was conducted <br />for the Storage Silo area. The stability analysis indicated that the construction design of the Storage Silo was <br />adequate. <br />No. 5 Conveyor and Stacker Belt - Historically, the No. 5 Conveyor extended from the No. 5 Portal and fed coal to the <br />No. 5 Stacker Belt. From the stacker, coal was fed to the raw coal storage pile. This 48 inch conveyor and stacker <br />belt has been removed from the site. <br />• <br />Permit Renewal RN08-05 2.05-11 01/15/09