Laserfiche WebLink
a ?. ?' YY <br />Sodwm reuse <br /> <br /> <br />pollntatus and to prevent downward percolaoon of such products or <br />pollutants into aquifers. Oil steak ore shall be stockpiled to protect the <br />mineral resources as determined by the authorized officer. <br />(3) Lessoe shall develop, and submit as pact of its mine plan. a <br />reclamation plan specifically for those areas ofdisqubanc+e defined as <br />having tow or very low reclamation potential as identified in the <br />Sodium Preference Right Lease Application Environmental Assess- <br />mecc Section 4.103. 't'ie plan must demcoosum to the complete <br />satisfaction of the authorized oflioer that the lands can be reclaimed <br />utilizing current technologies. 'the authorized offrca shall deem die <br />subject lands unsuitable for surface occupancy or disturbance if the <br />plan does notadequately demonstratea high probability for success of <br />reclamation. <br />(4) Aspanofits minepim itsseeshall sulnnitsocial, econotmic.and <br />transportation impact data concerning oBsie, aspects of the proposed <br />developnw= including: <br />(A) The estimated number and type of employees the lease <br />opega&os will requite during pham of construction and opera' <br />and the specific years each number and type of employees will <br />required. <br />(B)Mw contemptvzddcoasrructiornof transpO=m f=ides <br />the estimated transportation mode(s). route(s), and firrquencY of t <br />for the extrgicted mources: and the estimated effect of any tr <br />movements on ft rate of roadway pavement deterioration, on <br />,design life of the vanspomtion made. on the level of surface ref <br />and on overall safety to the motoring public. <br />(C) The estimated effect of the influx of population on <br />transportation system at the county and local level resulting from <br />proposed development. <br />(D)L==shall update the dataarnnuallyto thesatisfactionoi <br />authorizedoffiteruntil itsoperations machafullorstable level. Le: <br />that shall update its data whenever it plans a major change it <br />operations (such as expansion. transportatim mode change, clos <br />vac.) and prior m implementation of the change(s). <br />Nam" Inc. <br />Can"" Nam <br />?f <br />164alft" of LM") <br />frok) <br />(am) <br />Investment Company <br />(AM) <br />(Continued) <br />Edward N. 3uhan <br />Barfiam lean Iuhan Hunter