My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-07-30_REVISION - C1982056
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1982056
>
2009-07-30_REVISION - C1982056
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:49:15 PM
Creation date
7/30/2009 1:40:24 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982056
IBM Index Class Name
REVISION
Doc Date
7/30/2009
Doc Name
Letter Application and Public Notice
From
Twentymile Coal Company
To
DRMS
Type & Sequence
TR69
Email Name
JHB
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Peabody <br />Twentymile Coal <br />July 24, 2009 <br />Mrs. Janet Binns, Environmental Protection Specialist <br />Colorado Division of Reclamation, Mining, and Safety <br />1313 Sherman Street, Room 215 <br />Denver, Colorado 80203 <br />(303) 866-3567 X8107 <br />29515 Routt County Road 27 <br />Oak Creek, CO 80467 <br />970.879.3800 <br />RFrr'INIE® <br />JUL b Q Ljn9 <br />Division u -%_,awation, <br />Mining and Safety <br />RE: Twentymile Coal Company - Foidel Creek Mine (Permit No. C-82-056), Technical <br />Revision (TR09-69) for the 6-Right Thickener Underflow Borehole and Pipeline Project <br />Dear Mrs Binns: <br />Twentymile Coal Company (TCC) requests CDRMS approval of a Technical Revision to our existing <br />approved Permit for construction, operation, and reclamation of a new thickener underflow borehole, <br />pipeline, and associated ancillary equipment and facilities at the 6-Right (6RT) location. The new <br />thickener underflow installation is needed to provide for transfer and discharge underground of <br />thickener underflow slurry in the Eastern Mining District, in addition to the existing thickener <br />underflow discharge in the Southwestern Mining District. <br />The 6RT Thickener Underflow Borehole installation will be located southeast of the intersection of <br />Routt County Roads 27 (RCR27) and 33 (RCR33), on the north side of Foidel Creek and the <br />Twentymile Mine railroad spur. The Thickener Underflow Borehole will extend approximately 540 <br />feet from the surface into the sealed Eastern Mining District (EMD) mine workings. An existing light- <br />use road extends approximately 250 feet from RCR33 to this location. A pad and required drainage <br />structures will be constructed. A buried thickener underflow pipeline will be installed between the <br />existing washplant facilities and the new Thickener Underflow Borehole. <br />Installation of the Thickener Underflow Borehole will involve placement of construction erosion <br />controls (silt fence and/or straw wattles), removal and windrowing of soil materials from the pad area <br />and road margins, grading to establish a level drill pad and improve the existing light-use road, <br />placement of gravel as surfacing for the light-use road, excavation of a temporary cuttings pit on the <br />drill pad, drilling and casing of the borehole, and installation of an access manhole. On completion of <br />drilling and casing operations, the cuttings pit will be allowed to dry-out, material excavated from the <br />pit will be replaced and graded, and the pad surface will be graveled to control erosion and sediment <br />and provide an all-weather operating surface. The completed Thickener Underflow Borehole <br />installation will include the light-use road, a soil material stockpile (pad and road); a 70 x 70 foot pad; <br />the 6-inch cased borehole, a 14-inch cemented surface casing, and a covered 8-foot diameter CMP <br />culvert manhole with lightening protection. <br />Pipeline installation will involve removal and windrowing of soil materials; trenching in most areas; <br />placement of suitable bedding materials; placement, connection, and pressure testing of the pipelines; <br />backfilling and compaction of suitable fill materials around and over the pipelines; backfilling and <br />compaction of the trench; regrading; replacement of soil materials; and revegetation of all disturbed
The URL can be used to link to this page
Your browser does not support the video tag.