amen <br />Earth 8 Environmental <br />F) Material Processing <br />1) South Cresson Clay Processing Area <br />Processing of Soil Liner Fill material continued at the South Cresson Clay Processing area. A <br />CAT D-6 dozer, a CAT 320 excavator, and a CAT 966 front-end loader were used to process <br />the material. <br />Location This Week <br />(tons) Cumulative <br />(tons) Comments <br />So Cresson Clay Processing 8,263 48,527 <br />Squaw Gulch Processing - 35,816 Processing in area complete. <br />Total 0 84,343 <br />G) Miscellaneous <br />No work performed during the week. <br />III) Underground Working <br />A) Drilling <br />Confirmation drilling was performed at Underground Working #3005 (near station A10+50) using <br />one track mounted drill rig. An AMEC representative observed the drilling constantly. <br />B) Mine Shaft/Stope Remediation <br />No work performed during the week. <br />C) Lateral/Slot Remediation <br />No work performed during the week. <br />IV) Storm Water Management Structures <br />A) Control Structures <br />No work performed during the week. <br />B) Best Management Practices <br />Best Management Practices are being observed throughout the VLF Phase 5 Project. <br />V) VLF Geosynthetics <br />No work performed during the week. <br />CQA ACTIVITIES: <br />SUMMARY: <br />The CQA activities performed consisted of observing, documenting and recording the construction <br />activities of the contractor. <br />AMEC observed placement of structural fill within the Phase 5 VLF fill area. <br />AMEC observed grouting of confirmatory drill holes at Underground Working #3005. <br />Sheet 3 of 6 <br />VLF Weekly Report WE 07.18.09.D.doc