Y <br />amen <br />Earth & Environmental <br />E) Cut to Fill <br />1) VLF <br />A John Deere 850D excavator, a Komatsu 800 excavator, a CAT 375 excavator, and a CAT <br />385 track excavator excavated structural fill material from the following areas: between <br />stations J22+00 (+/-) and J23+50 (+/-), approximately 0 to 100 feet left of centerline; between <br />stations J10+00 (+/-) and J14+00 (+/-), approximately 200 to 400 feet left of centerline; <br />between stations H26+00 (+/-) and H32+50 (+/-), approximately 0 to 75 feet right of <br />centerline; between stations A8+00 (+/-) and A10+00 (+/-), approximately 30 feet left of <br />centerline to 30 feet right of centerline; between A22+00 (+/-) and A23+50 (+/-), <br />approximately 75 to 300 feet right of centerline; and between stations A44+00 (+/-) and <br />A46+00 (+/-), approximately 0 to 50 left of centerline. The structural fill material was <br />transported using 777 haul trucks and 40-ton articulating haul trucks. <br />Structural fill was placed between stations A38+00 (+/-) and A47+00 (+/-), approximately 100 <br />feet right of centerline to 300 feet left of centerline. Structural fill was placed using CAT <br />dozers in 18" to 24" lifts (based on rock size). Moisture conditioning of the fill was performed <br />using a CAT 773-water truck. Each lift was compacted with a 10-ton smooth drum vibratory <br />compactor passing over the entire surface at least 4 times (method compaction technique is <br />applicable). <br />Structural fill was placed between stations A22+00 (+/-) and A26+00 (+/-), approximately 50 <br />feet left of centerline to 100 feet right of centerline. Structural fill was placed using CAT <br />dozers in 18" to 24" lifts (based on rock size). Moisture conditioning of the fill was performed <br />using a CAT 773-water truck. Each lift was compacted with a 10-ton smooth drum vibratory <br />compactor passing over the entire surface at least 4 times (method compaction technique is <br />applicable). <br />Structural fill was placed between stations K9+00 (+/-) and K13+50 (+/-), approximately 40 <br />right of centerline to 40 feet left of centerline. Structural fill was placed using CAT dozers in <br />18" to 24" lifts (based on rock size). Moisture conditioning of the fill was performed using a <br />CAT 773-water truck. Each lift was compacted with a 10-ton smooth drum vibratory <br />compactor passing over the entire surface at least 4 times (method compaction technique is <br />applicable). <br />Structural fill was placed between stations 1-18+00 (+/-) and H12+00 (+/-), approximately 0 to <br />100 feet right of centerline. Structural fill was placed using CAT dozers in 18" to 24" lifts <br />(based on rock size). Moisture conditioning of the fill was performed using a CAT 773-water <br />truck. Each lift was compacted with a 10-ton smooth drum vibratory compactor passing over <br />the entire surface at least 4 times (method compaction technique is applicable). <br />Slope scaling and slope preparation were performed through out the week using a CAT 345 <br />excavator and a CAT 330 excavator. <br />Drilling and blasting was performed between stations A14+52 (+/-) and A17+80 (+/-), <br />approximately 10 feet right of centerline. Drilling was performed using two track mounted drill <br />rigs. This area was shot Tuesday, 7/14/2009. <br />Sheet 2 of 6 <br />VLF Weekly Report WE 07.18.09.D.doc