My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-07-22_PERMIT FILE - M2009035
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2009035
>
2009-07-22_PERMIT FILE - M2009035
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:49:00 PM
Creation date
7/27/2009 3:15:04 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2009035
IBM Index Class Name
PERMIT FILE
Doc Date
7/22/2009
Doc Name
Preliminary adequacy review
From
DRMS
To
M.A. Concrete Construction, Inc.
Email Name
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-3- <br />amount. <br />4. EXHIBIT F - Reclamation Map (Rule 6.4.6): Please provide a revised map(s) that includes <br />clarification for the following items: <br />• Show the configuration of the two proposed mine phases and clearly label the permit <br />boundary and be sure the map has a scale. <br />• State the average thickness of replaced overburden by reclamation area or phase. <br />5. EXHIBIT L - Reclamation Costs (Rule 6.4.12): Please provide clarification for the following items: <br />• This section states that the applicant has existing stockpiled material stored at the site <br />that will be used for the mining operations. Please locate the stockpiled material on the <br />pre-existing conditions map. <br />• Exhibit L states that 44.6 acres will be backfilled and compacted. The application is <br />only for 30.25 acres. Please explain the differences in acreage. <br />6. Special Provisions - 112 Reclamation Permit Application (Rule 1.6.5): Please provide clarification <br />for the following items: <br />• Per Rule 1.6.5(2), within ten days after the last publication or as soon thereafter as proof <br />has been obtained, the applicant shall mail proof of publication required by Rule <br />1.6.2(1)(d) to this office. Proof of publication may consist of either a copy of the last <br />newspaper publication, 'to include the date published, or a notarized statement from the <br />news paper. An application may not be approved until such proof has been obtained. <br />This is a preliminary review. Other issues may arise from other agency comments, and as more information is <br />supplied. This application cannot be approved until the issues brought forth are adequately addressed. Please submit a <br />response to the following issues as soon as possible, but no later than August 21, 2009 so the decision due date set for <br />September 1, 2009 can be met. If your response or a written extension request are not received by August 21„ 2009 <br />this application may be denied. <br />If you need additional information, please contact me at the Division of Reclamation, Mining and Safety, Grand <br />Junction Field Office, 101 S. 3rd St., Suite 301, Grand Junction, Colorado 81501, telephone no. 970.241.2042. <br />Sincerely, <br />Travis Marshall <br />Environmental Protection Specialist <br />cc: Steve Shuey, DRMS
The URL can be used to link to this page
Your browser does not support the video tag.