My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-07-21_PERMIT FILE - M2009056 (5)
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2009056
>
2009-07-21_PERMIT FILE - M2009056 (5)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:48:58 PM
Creation date
7/21/2009 3:07:19 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2009056
IBM Index Class Name
PERMIT FILE
Doc Date
7/21/2009
Doc Name
New 110c Application
From
Destiny Mining, LLC
To
DRMS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
86
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6.3.4 EXHIBIT "D" - RECLAMATION PLAN <br />1) This application includes the following information in accordance with the <br />Regulations: Rule 3. <br />A. Reclamation would start when the 25 foot depth was obtained and the mining area <br />was 60 feet from the north wall and 60 feet from east wall in the northeast corner <br />of the pit area. Back filling would start out to 35 feet. We would then amend the <br />mining permit to go another 25 feet deeper if we determined viable. If the permit <br />was not amended, we would continue to back fill the pit as it is mined keeping a <br />distance of about 30 feet from the loaders and track hoe digging in pit. By the <br />time the pit is finished being mined, there would be 30 foot area left to back fill. <br />Then would back fill and would be sloped or flat. <br />B. Maximum grading of reclaimed area would be 3 horizontal: l vertical or flatter to <br />accommodate the grazing wildlife habitat and recreational purpose of the land. <br />C. Measures that would be taken to re-vegetate the site is as follows: <br />i. Replace growth media will be replaced at a depth of 4"-6" and any back <br />slopes finished at a 3 horizontal:I vertical. <br />ii. The time of seeding, seed bed preparation, type application rate and soil <br />incorporation, method of federalization application. Fall seeding is <br />preferred if at all possible. Reshaping or contouring would be done using <br />topsoil that is stockpiled at a depth of 4"-6". All the slopes shall be at no <br />greater than 3' horizontal; 1' vertical slope. The topsoil will be spread and <br />smoothed and 35-40 pounds an acre of actual nitrogen(N) phosphorus(P) <br />and if needed potassium(K). A soil test will be taken to determine the <br />appropriate amounts of needed elements and then seed mix would be done <br />by broadcasting and packing the seed mix as recommended by Natural <br />Resources Conservation Services. The seed mix is as follows per acre <br />below: <br />Stream wheatgrass V.Sodar 51bs <br />Western wheatgrass V.Rosanna 5 lbs <br />Arizona fescue V.Redondo 21bs <br />Sanaberg bluegrass 1 lb <br />Hard fescue 1 lb <br />Blue grama V.Hachita 1 lb <br />Tufted hairgrass 2 lbs <br />Strawberry clover 1 lb <br />Yarrow 1 lb <br />Rocky mountain penstemon 1 lb <br />Total lbs 20 lbs
The URL can be used to link to this page
Your browser does not support the video tag.