My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-07-15_REVISION - M1980244 (39)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2009-07-15_REVISION - M1980244 (39)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:52:21 PM
Creation date
7/21/2009 11:12:05 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REVISION
Doc Date
7/15/2009
Doc Name
LOB Relocate- Appendix D- Tech Specs 2
From
CC&V
To
DRMS
Type & Sequence
AM9
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ame <br />• PART 2: PRODUCTS <br />2.01 MATERIALS <br />A. Portland Cement, ASTM C 150, Type H. <br />B. Coarse Aggregate, ASTM C 33, except that clay and shale particles shall not exceed 1 percent of total <br />aggregate. <br />C. Fine Aggregate, ASTM C 33, washed natural sand. <br />2.02 MIXES <br />A. Mix Designs: <br />Concrete mix design shall be designed by an independent testing laboratory. <br />B. Cast-In-Place Concrete: <br />1. Cast-in-place concrete with reinforcing steel shall have a minimum 28-day compressive <br />strength of 4,000 psi. <br />2. Maximum Aggregate size of 1-inch. <br />is 3. Placement slump between 2-inches and 5-inches. <br />4. Air entrainment of 5% to 8%. <br />2.03 CURING COMPOUNDS <br />Concrete curing compound shall be a clear compound complying with ASTM C 309, Type 1-D, Class A and <br />B, such as "RES-X" by Burke, or an equivalent approved by CERTIFYING ENGINEER:. <br />PART 3: EXECUTION <br />3.01 STRUCTURAL CONCRETE <br />Place structural concrete as shown on DRAWINGS. <br />3.02 INSTALLATION <br />A. Ready-Mix Concrete shall be batched, transported, and placed in accordance with ASTM C 94. Each <br />batch delivered to the Site shall be accompanied by a certified weight master's delivery ticket. <br />B. All mixed concrete delivered to the Site shall be placed within 90 minutes from the time of <br />introduction of cement and water into the mix. <br />C. No water shall be added after leaving the batch plant without the approval of CERTIFYING <br />ENGINEER. <br />• D. Placement of concrete, once started, shall be performed as a continuous operation until the scheduled <br />placement is completed. <br />Section 03300 Page 2 of 4 September 3, 2008 <br />Cast-In-Place Concrete Revision 1 <br />SAProjects\1125 CC&V Phase 5 VLF\I - Tech Specs\Arequa IFC Specs\03300.r1.doc
The URL can be used to link to this page
Your browser does not support the video tag.