Laserfiche WebLink
• <br />Cripple Creek & Victor Gold Mining Company <br />Cresson Project <br />Quality Assurance Monitoring and Test Results <br />Load Out Bin Relocation <br />July 7, 2009 <br />ameO <br />Table of Contents (Continued) <br />LJ <br />• <br />Appendix G Subgrade Acceptance Forms <br />Appendix H CQA Laboratory Test Results <br />Appendix H-1 Grain Size Distribution, Moisture Content and Atterberg Limits <br />Appendix H-2 Compaction Tests <br />Appendix H-3 Soil Liner Fill Permeability Tests <br />Appendix I Geomembrane Quality Control Documents and Inventory <br />Appendix 1-1 Geomembrane Inventory Control <br />Appendix 1-2 Resumes of Installation Personnel <br />Appendix 1-3 Geomembrane Resin Quality Control Certificates <br />Appendix 1-4 Geomembrane Roll Quality Control Certificates <br />Appendix 1-5 Welding Rod Quality Control Certificates <br />Appendix J Geomembrane Installation Observations <br />Appendix J-1 Geomembrane Deployment Observations <br />Appendix J-2 Geomembrane Trial Seam Summaries <br />Appendix J-3 Geomembrane Fusion Welding Summary <br />Appendix J-4 Geomembrane Extrusion Welding Summary <br />Appendix J-5 Geomembrane Defect/Repair Summary <br />Appendix J-6 Geomembrane Non-Destructive Testing Summaries <br />Appendix J-7 Geomembrane Destructive Testing Summaries <br />Appendix K Conformance Test Results <br />Appendix L Tensiometer Certification <br />SAPROJECTS\1125E CCV CQA\H3 - CONSTRUCTION\LOB CERT REPORT\REPORT BODY\LOB CERT REPORT 2009.07.07.DOC <br />Iv