Laserfiche WebLink
• <br />Cripple Creek & Victor Gold Mining Company <br />Cresson Project <br />Quality Assurance Monitoring and Test Results <br />Load Out Bin Relocation <br />July 7, 2009 <br />List of Tables <br />ameO <br />Table 1 Summary of Earthworks Material Specifications <br />Table 2 Summary of Weather Data <br />Table 3 Underground Remediation Summary <br />Table 4 Earthworks CQA Test Summary and Testing Frequency <br />Table 5 CQA Laboratory Test Summary, Structural Fill <br />Table 6 CQA Laboratory Test Summary, Soil Liner Fill <br />Table 7 CQA Laboratory Test Summary, Drain Cover Fill <br />Table 8 Field Density and Moisture Content Test Summary, Soil Liner Fill <br />Table 9 Soil Liner Fill Depth Verification Summary <br />List of Figures <br />• <br />Figure 1 Cresson Project VLF Site Plan <br />Figure 2 Certification Boundary <br />Figure 3 Destructive Sample Test Codes for Extrusion Welds with Leister Heat Seams <br />Figure 4 Destructive Sample Test Codes for Dual Hot Wedge Fusion Welds <br />Figure 5 LOB Pad Final Grading <br />Figure 6 Geomembrane As-Built Drawing <br />Figure 7 DCF Thickness Isopach <br />List of Drawings <br />A200 LOB Foundation Layout <br />A225 Ultimate LOB Platform Layout <br />A250 LOB Platform Section and Details <br />A290 Underground Working Remediation Typical Details <br />List of Appendices <br />• <br />Appendix A Photographic Documentation <br />Appendix B Staff Schedule for Personnel <br />Appendix C Weekly Reports <br />Appendix D Technical Specifications <br />Appendix E Ames Record Drawings <br />Appendix F Surveyor's Certificate <br />SAPROJECTS\1125E CCV CQA\H3 - CONSTRUCTION\LOB CERT REPORT\REPORT BODY\LOB CERT REPORT 2009.07.07.DOC