Laserfiche WebLink
Due to spoil side stripping techniques employed at Trapper, extra room is needed to effectively place spoils. <br />Taking into consideration that the shortest cycle time in Flintlock Pit leaves the pit active for 230 days and <br />that the interburden will be cast as far as three previous cuts, it is not possible to regrade the spoils within <br />180 days after coal removal. For Trapper Mine's contemporaneous regrade criteria, grading will progress <br />such that there will be no more than three un-regraded spoil rows, including the active spoil row, at any one <br />time in each pit. A pictorial view of the double pass stripping operation is shown in Figure 3.5-1. This figure <br />presents a simplification of the Trapper stripping operation and shows graphically why three spoil rows are <br />required. <br />C <br /> <br /> <br />3-39b <br />.- <br />Revision-, P R - <br />Approved: