2009-07-17_REPORT - M1980244 (4)
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2009-07-17_REPORT - M1980244 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:52:22 PM
Creation date
7/20/2009 11:43:27 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REPORT
Doc Date
7/17/2009
Doc Name
Weekly Construction Quality Assurance ("CQA") Report- 6/28/09
From
CC&V
To
DRMS
Type & Sequence
AM9
Email Name
BMK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
amec <br />Earth 8 Environmental <br />compactor passing over the entire surface at least 4 times (method compaction technique is <br />applicable). <br />Slope scaling and slope preparations were performed through out the week using a CAT 345 <br />excavator. <br />Blast pattern drilling was performed between stations A10+00 (+/-) and A14+00 (+/-), <br />approximately 40 left of centerline to 40 feet right of centerline and between stations A20+00 <br />(+/-) and A22+00 (+/-), approximately 0 to 50 feet left of centerline using two track mounted <br />drill rigs. Three blasts were performed in these areas throughout the week. <br />F) Material Processing <br />1) South Cresson Clay Processing Area <br />Processing of Soil Liner Fill material continued at the South Cresson Clay Process. A CAT D- <br />6 dozer, a CAT 320 excavator, and a CAT 966 front-end loader were used to process the <br />material. <br />Location This Week <br />tons Cumulative Comments <br />So Cresson Clay Processing 4,090 41,075 <br />Squaw Gulch Processing - 35,816 Processing in area complete. <br />Total 0 72,270 <br />G) Miscellaneous <br />No work performed during the week. <br />III) Underground Working <br />A) Drilling <br />No work performed during the week. <br />B) Mine Shaft/Stope Remediation <br />No work performed during the week. <br />C) Lateral/Slot Remediation <br />No work performed during the week. <br />IV) Storm Water Management Structures <br />A) Control Structures <br />No work performed during the week. <br />B) Best Management Practices <br />Best Management Practices are being observed throughout the VLF Phase 5 Project. <br />V) VLF Geosynthetics <br />No work performed during the week. <br />Sheet 3 of 6 <br />VLF Weekly Report WE 07.04.09.D.doc