amen <br />Earth & Environmental <br />D) Subgrade Preparation <br />1) VLF <br />Subgrade preparation was performed in the existing drainage between stations E2+00 (+/-) and <br />E22+00 (+/-), approximately 100 feet right of centerline. This area was ripped to a depth of 6" <br />to 8" using a CAT D-6 dozer. The area was moisture conditioned and compacted using a CAT <br />563 vibratory smooth drum compactor passing over the entire surface at least 4 times. The area <br />was inspected and accepted by an AMEC representative prior to any fill placement. <br />Subgrade preparation was performed between stations K12+00 (+/-) and K13+00 (+/-), <br />approximately 0 to 100 feet left of centerline. The sediment pond in the area was excavated <br />using a CAT 345 excavator to excavate sediment from the pond. The removed material was <br />hauled to the overburden stockpile area east of the east perimeter road near stations A28+00 <br />(+/-) to A36+00 (+/-). Competent material was encountered in the pond and a thin lift of fill <br />was placed in the pond. Compaction was performed using a CAT 563 vibratory smooth drum <br />compactor passing over the entire surface at least 4 times. The area was inspected and accepted <br />for fill placement by an AMEC field representative. <br />E) Cut to Fill <br />1) VLF <br />A John Deere 850D excavator, a Komatsu 800 excavator, a CAT 375 excavator, and a CAT <br />385 track excavator excavated structural fill material from the following areas: between <br />stations J6+00 (+/-) and J8+00 (+/-), approximately 75 to 100 feet left of centerline; between <br />stations H25+00 (+/-) and H28+50 (+/-), approximately 0 to 100 feet right of centerline; <br />between stations A 10+00 (+/-) and A 12+00 (+/-), approximately 40 left of centerline to 40 feet <br />right of centerline; and between stations A 16+00 (+/-) and A 18+00 (+/-), approximately 40 <br />feet left of centerline to 40 feet right of centerline. The structural fill material was transported <br />using 777 haul trucks and 40-ton articulating haul trucks. <br />Structural fill was placed between stations A24+00 (+/-) and A28+00 (+/-), approximately 30 <br />feet right of centerline to 75 feet left of centerline. Structural fill was placed using CAT dozers <br />in 18" to 24" lifts (based on rock size). Moisture conditioning of the fill was.performed using a <br />CAT 773-water truck. Each lift was compacted with a CAT 563 smooth drum vibratory <br />compactor passing over the entire surface at least 4 times (method compaction technique is <br />applicable). <br />Structural fill was placed between stations K7+00 (+/-) and K12+50 (+/-), approximately 0 to <br />300 feet left of centerline. Structural fill was placed using CAT dozers in 18" to 24" lifts <br />(based on rock size). Moisture conditioning of the fill was performed using a CAT 773-water <br />truck. Each lift was compacted with a CAT 563 smooth drum vibratory compactor passing <br />over the entire surface at least 4 times (method compaction technique is applicable). <br />Structural fill was placed between stations F8+00 (+/-) and F12+00 (+/-), approximately 150 <br />feet left of centerline to 150 feet right of centerline. Structural fill was placed using CAT <br />dozers in 18" to 24" lifts (based on rock size). Moisture conditioning of the fill was performed <br />using a CAT 773-water truck. Each lift was compacted with a CAT 563 smooth drum vibratory <br />Sheet 2 of 6 <br />VLF Weekly Report WE 07.04.09.D.doc