My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-07-17_REPORT - M1980244
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2009-07-17_REPORT - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:52:22 PM
Creation date
7/20/2009 11:43:06 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REPORT
Doc Date
7/17/2009
Doc Name
Weekly Construction Quality Assurance ("CQA") Report- 6/21/09
From
CC&V
To
DRMS
Type & Sequence
AM9
Email Name
BMK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ameO <br />Earth & Environmental <br />IV) Storm Water Management Structures <br />A) Control Structures <br />No work performed during the week. <br />B) Best Management Practices <br />Best Management Practices are being observed throughout the VLF Phase 5 Project. <br />V) VLF Geosynthetics <br />No work performed during the week. <br />CQA ACTIVITIES: <br />SUMMARY: <br />The CQA activities performed consisted of observing, documenting and recording the construction <br />activities of the contractor. <br />AMEC observed placement of structural fill within the Phase 5 VLF. <br />AMEC observed and accepted subgrade within the Phase 5 VLF. <br />AMEC observed the installation of the LOB Storm Water Culverts. Nuclear density test were performed <br />during installation with passing results. <br />Testing Summary <br />Laboratory testing continues (Particle Size Distribution, Atterberg Limits, and Moisture-Density <br />Compaction testing) for sampled materials. <br />GENERAL PROJECT ITEMS <br />Summary of Concerns: <br />No Concerns <br />Summary of Planning Items: <br />Structural fill placement for the Phase 5 VLF will continue. <br />Continue processing Soil Liner Fill at the South Cresson Clay Processing area. <br />Continue slope contouring above the East Perimeter Road. <br />Continue subgrade preparation within the VLF footprint. <br />Continue the excavation work at the planned water storage tank location. <br />Continue clearing and grubbing at the east slope of the Phase 5 VLF. <br />Summary of Non-conformances: <br />None Issued <br />Summary of Meetings and Discussions: <br />CC& V. <br />CC&V held a Weekly Construction meeting on June 23, 2009. Items discussed included Safety, <br />Environmental, Schedule, QC documentation, and CQA. <br />Sheet 4 of 7 <br />VLF Weekly Report WE 06.27.09.D.doe
The URL can be used to link to this page
Your browser does not support the video tag.