Laserfiche WebLink
In addition to mechanical integrity testing and subsequent plugging and abandonment <br />work on the production wells, and continued ground water monitoring throughout the <br />well field, the roads and well pads were inspected periodically for erosion and the <br />presence of noxious weed populations. Approved herbicides were applied by certified <br />contractors periodically throughout the reporting period to control undesirable <br />vegetation. <br />The following photos show the reclamation growth in various areas of the well field <br />during the report period. <br />American Soda, L.L.P <br />DBMS Annual Report <br />July 9. 2009 <br />Photo 7 - December 2008 photo of contractor equipment on site cement plugging the long sting of <br />production well 20-19. Cement trucks, crane, coil tubing truck, and water trucks are some of the <br />equipment surrounding the small green well skid on the left side of the photo. The morning of the first day <br />was clear and cold.