Photo 6 - December 2008 photo of contractor equipment on well pad 20-19 on first day of plugging and <br />abandonment work. In this photo the injector head and manifold tree for the coil tubing equipment is <br />suspended by a crane above the well. The water that must be circulated through the equipment for the <br />plugging work froze multiple times the first day due to freezing temperatures. A specialized truck was <br />mobilized and retained on stand-by for the rest of the week to heat the water prior to circulation above <br />ground to prevent freezing. <br />American Soda. L.L.P. <br />DRMS Annual Report <br />July 9. 2009