My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMIT FILE - 7/16/2009, 2:36:13 PM-MR1
DRMS
>
Public
>
PERMIT FILE - 7/16/2009, 2:36:13 PM-MR1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:28:39 PM
Creation date
7/16/2009 2:52:22 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
P2009021
IBM Index Class Name
PERMIT FILE
Doc Date
7/7/2009
Doc Name
New NOI (non-confidential)
From
Cotter Corporation
To
DRMS
Email Name
GRM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7 (Form 2- Public) <br />7. last the seed mixture to be used in the re-establishment of vegetation. See the attached seed mixture calculation to obtain <br />PLS/acre. For assistance with formulating seed mixtures and rates, contact the local NRCS if on private land, BLMI JUSFS if <br />on public land or State Land Board if on state land. <br />A. Provide plant name and seeding rate <br />Plant Name -- Seeding Rate (PLS/acre) <br />See Appendix C <br />B. Describe the method for seed bed preparation, and application method for grass/forb seeding: <br />Following reclamation, the surface is back-dragged with a toothed loader bucket or equivalent, seed <br />Qed o_yer bX chain link. See <br />is hand broadcast_and_gther back dragged agate, hand raked or drag <br />_2tt2Eha?t Annanrlix C for D OX ?]} (1111IPmPn*c -- _ -- <br />fir. TERMS AND CONDITIONS FOR PROSPECTING OPERATIONS: <br />1. Reclamation measures shall be fulfilled in a timely manner and completed within five (5) years of completion. of prospecting <br />activities. <br />2. The prospecting operations described in this `notice will be conducted in such a manner as to minimize surface disturbances. <br />In addition to the measures required in Rule 5, precautions to be taken include: <br />A. Confinement of operations to areas near existing roads or trails, where practicable. Existing roads which are to remain as <br />permanent roads after prospecting activities are completed shall be left in a condition equal to or better than the pre- <br />prospecting condition, <br />& Drilling shall be conducted in such a way as to prevent cuttings and fluids from directly entering any dry or flowing <br />stream cban.nci. Drill cuttings must be spread to a depth no greater than one-half (1 /2) inch or buried in an approved. <br />disposal. pit-,
The URL can be used to link to this page
Your browser does not support the video tag.