My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMIT FILE - 7/16/2009, 2:36:13 PM-MR1
DRMS
>
Public
>
PERMIT FILE - 7/16/2009, 2:36:13 PM-MR1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:28:39 PM
Creation date
7/16/2009 2:52:22 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
P2009021
IBM Index Class Name
PERMIT FILE
Doc Date
7/7/2009
Doc Name
New NOI (non-confidential)
From
Cotter Corporation
To
DRMS
Email Name
GRM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6 (Form. 2- Public) <br />3. Describe the estimated topsoil depth and how topsoil will be salvaged, stockpiled and redistributed for the re-establishment of <br />vegetation. Specify approximate topsoil redistribution depth: <br />Topsoil, if present, is estimated to be less than 1 foot kT. Any topsoil disturbed will be saved, stockpiled <br />_to one_side_ and.redis rib ed over-said disturbed area during. reclamation. 4. Describe how drill holes will be plugged (refer to Rule 5.4 of the Rules for required abandonment procedures): <br /> <br />Any cuttings are to be returned to the hole to the extent possible. Remaining cuttings will be buried in the <br />containment pit. The hole will be plugged with spray foam from five feet to within two feet of the surface <br />and filled with available so air coil mixed with cuttings. <br />5. Describe how portals, adits, shafts, ponds, excavations, or other disturbances will be reclaimed (refer to Rule 3 and Rule 5 for <br />specific reclamation performance standards). You may wish to contact the Division for closure specifications. <br />The topsoil from the containment pit will be bermed on the lower side. When reclaiming the site the <br />berine?i soil will be -nushed back across the pit, dragged or raked and seeded with the approved seed mixture. <br />b. Describe how roads will be reclaimed or returned to their pre-prospecting (or better) condition: <br />No road disturbance is expected.
The URL can be used to link to this page
Your browser does not support the video tag.