My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMIT FILE - 7/16/2009, 2:33:49 PM-MR1
DRMS
>
Public
>
PERMIT FILE - 7/16/2009, 2:33:49 PM-MR1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:28:39 PM
Creation date
7/16/2009 2:52:09 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
P2009019
IBM Index Class Name
PERMIT FILE
Doc Date
7/7/2009
Doc Name
New NOI (non-confidential)
From
Cotter Corporation
To
DRMS
Email Name
GRM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7 (Form 2- Public) <br />7. List the seed mixture to be used in the re-establishment of vegetation. See the attached seed mixture calculation to obtain <br />PLSlacre. For assistance with formulating seed mixtures and rates, contact the local MRCS if on private land, BLWTSFS if <br />on public land or State Land Board if on state land, <br />A. Provide plant name and seeding rate <br />??-Plant Name Seeding Rate (PLS/acre) <br />See Appendix C <br />1 <br />f <br />B. Describe the method for seed bed preparation, and application method for grass; fork seeding: <br />Following reclamation, the surface is back-dragged with a toothed loader bucket or equivalent, <br />seed is hand broadcast and either back-dragged again, hand raked or dried over by chain link. <br />See attached Appendix C for j).D F seeediltg requirements_ <br />V. TERMS AND CONDITIONS FOR PROSPECTING OPMMONS: <br />L Reclamation measures shall be fulfilled in a timely manner and completed within five (5) years of completion. of prospecting <br />activities, <br />?. "The prospecting operations described in this Notice: will be conducted in. such a manner as to minimize surface disturbances, <br />fn addition to the measures required in Rule 5, precautions to be. taken include: <br />A. Confinement of operations to areas near existing roads or trails, where practicable. Existing roads which are to remain as <br />permanent roads after prospecting activities are completed shall be left in a condition equal to or better than the pre- <br />prospecting condition; <br />B. Drilling shall be conducted in such a k ay as to prevent cuttings, and fluids from directly entering any dry or flowing <br />4trearn eba€.inel. Drill cuttings nnust be spread to a depth no tzwater than one-half (112) inch or buried in an approved <br />disposal, pit;
The URL can be used to link to this page
Your browser does not support the video tag.