Laserfiche WebLink
6 (Form 2- Public) <br />3. Describe the estimated topsoil depth and how topsoil will be salvaged, stockpiled and redistributed for the re-establishment of <br />vegetation. Specify approximate topsoil redistribution depth: <br />--Topsail,. preseanll is estimated to he less than 1 foot dejaA Any topsoil disturbed will be saves,. stockpiled <br />--to-me-side and Re ''? Ewef said disturbed °a during rwlarnatien. <br />4. Describe how drill holes will be plugged (refer to Rule 5.4 of the Rules for required abandonment procedures): <br />Any cuttings are to be returned to the hole to the extent possible. Remaining cuttings will be buried in the <br />con ainment .pits- The?holes will beplugge? with spray foam from five feet to within two feet of the <br />5. Describe how portals, adits, shafts, ponds, excavations, or other disturbances will be reclaimed (refer to Rule 3 and Rule 5 for <br />specific reclamation performance standards), You may wish to contact the Division for closure specifications. <br />The topsoil from the containment pits will be bermed on the lower side. When reclaiming the site the <br />wed soil will be pushed back across the pits, dragged or raked and seeded with the approved seed <br />6. Describe how roads will be reclaimed or returned to their pre-prospecting (or better) condition: <br />No road disturbance is expected.