Laserfiche WebLink
4 (Form 2- Public) <br />5. Describe proposed surface excavation or other land disturbance, including roads, pits, trenches, waste piles, drill pads and <br />collar areas of underground workings, ponds, etc... <br />Excavation and disturbances will be confined to the 5t' Level rehabilitation of the adit and water discha <br />trench. ( See page ?.5 <br />6. Proposed Disturbance (approximate) Describe the proposed drilling to be conducted, including anticipated number of holes, <br />diameter, depth, location, etc... Submit additional pages if necessary:. Sc° i0* <br />A. Drill Pads: Quantity Average Width (ft) Average Length (ft) <br />B. Drill Holes: Quantity Depth 'A00 n5,;12 (ft) Diameter (in) <br />C. Mud Pits: Quantity Average Width (ft) Average Length (ft) <br />Average Depth 00 (ft) <br />Described proposed underground work, including reopening of old workings, advancement of adits or shafts, <br />trenches, pits, cuts, rock dumps, or other types of disturbance, describe type, quantity and general dimensio <br />D. Other Disturbances (please describe): <br />B. indicate Chemicals and Fuels used or stored on site. List type, quantity and method to store. <br />- Small quantities of gasoline, tanor gas, diesel fuel will be properly stored at least 90 feet <br />from the portal in approved containers. <br /> <br />F. New Road(s): Length (ft) Width (ft} <br />Significantly Upgraded Road(s) Length (ft) Width (t}} <br />Are culverts or other crossings proposed? If so, please describe: _