My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-07-06_REVISION - M1977036 (40)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977036
>
2009-07-06_REVISION - M1977036 (40)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 2:20:31 PM
Creation date
7/7/2009 12:41:31 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977036
IBM Index Class Name
REVISION
Doc Date
7/6/2009
Doc Name
Amendment Submittal
From
Tetra Tech
To
DRMS
Type & Sequence
AM1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Spill Prevention and Response Procedures <br />The facility contains sufficient amounts of stored petroleum products as to require the <br />development of a formal Spill Prevention, Control, and Countermeasure (SPCC) Plan, a copy of <br />which is kept on site. Training and procedures established under SPCC rules are applied to all <br />petroleum storage within Lafarge facilities. Secondary containment is provided for the diesel <br />fuel storage tanks should releases occur. Removal of accumulated liquids from the containments <br />is accomplished by use of absorbents, portable pump, or other technique, and waste material is <br />properly disposed of. <br />In the event that a spill occurs: <br />o Do- <br />¦ Shut off supply, stop leak (if possible) <br />¦ Shut of ignition sources <br />¦ Contain spill and/or dike ahead of spill <br />¦ Notify Plant Manager. If the spill leaves the site or is greater than 25 <br />gallons, the Plant Manager will notify Resource Management Group. <br />¦ Protect adjacent people, property, surface waters, and equipment from <br />contact with spill <br />¦ Look to Material Safety Data Sheets (MSDS) for clean up guidance <br />Follow site SPCC plan <br />¦ Place absorbents, dirt, or other solid materials in a non-leaking container <br />and dispose of according to state and federal regulations <br />o Don't- <br />0 Smoke <br />¦ Risk personal injury <br />¦ Wash down spill with water <br />¦ Cover and not cleanup spill <br />The majority of manufacturing process includes solid earthen materials with inert properties that <br />would not impair surface or groundwater characteristics. The most common liquid not covered <br />under the facility petroleum management plan would be process water used in the production of <br />35' Avenue Pit, Concrete, & Asphalt Facilities <br />Storm Water Management Plan <br />Page 15 o('21
The URL can be used to link to this page
Your browser does not support the video tag.