Laserfiche WebLink
Sampling Information <br />At the 35TH Avenue site there are five (5) discharge points associated with the pit area; only <br />discharge point 001 is being utilized. When this point is discharging, weekly flow measurements <br />are recorded. Additionally, pH and TSS are measured monthly when discharge occurs and the <br />water is examined for presence of oil.. <br />Existing Discharge Sampling Data <br />Sampling <br />Point Quantity of Discharge Pollutants <br />001 Less than 1.5 MGD (combined 001 - <br />004) TSS, Oil and Grease, TDS <br />002 Currently not in use TSS, Oil and Grease, TDS <br />003 Currently not in use TSS, Oil and Grease, TDS <br />004 Currently not in use TSS, Oil and Grease, TDS <br />005 Currently not in use (permitted for less <br />than 5.76 MOD) TSS, Oil and Grease, TDS <br /> <br />Proposed Sampling Points <br />Sampling <br /> Description of Location Monitoring Requirements <br />Point <br />001 East discharge to Cache La Poudre Weekly, Monthly, Quarterly per <br /> permit and parameter <br />002 East-Central discharge to Cache La Weekly, Monthly, Quarterly per <br /> Poudre ermit and parameter <br />003 West-Central discharge to Cache La Weekly, Monthly, Quarterly per <br /> Poudre permit and parameter <br />004 West discharge to Cache La Poudre Weekly, Monthly, Quarterly per <br /> ermit d parameter <br />005 East discharge to Boyd Ditch Weekly, Monthly, Quarterly per <br /> permit and parameter <br />35' Avenue Pit, Concrete, & Asphalt Facilities <br />Storm Water Management Plan <br />Page 12 or 21