Laserfiche WebLink
User <br />GRM <br />Site :Jubilee Venture Filename :P015-05a <br />Agency or organization name :DRMS <br />Permit or other job action :Final Reclamation Liability Estimate <br />Task description : spread topsoil over pad / pond area <br />HOURLY EQUIPMENT COST <br />Basic machine : Cat D6R - 6S (2003) <br />Blade type :Straight <br />Attachment no. 1 :ROPS Cab <br />Attachment no. 2 :3-shank ripper <br />volume : 425 LCY <br />Horsepower: 165 <br />Shirt basis : 1 per day <br />Data source : (CRG) <br />factor : NA volume : 425 LCY <br />Source of estimated volume :6" topsoil over pad pond area <br />Source of estimated swell factor :NA <br /> <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 75 feet Material consistency : 1.20 (Cat HB) <br />Unadjusted hourly production : 357.1 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility : 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (1shift1day) <br />Loose stockpile Spoil pile : 0.810 (fnd-rf) <br /> Push gradient : 1.07 (Cat HB) <br />Average push gradient : 3.00 % (neg) Altitude : 1.00 (Cat HB) <br />Average site altitude : 700 feet Material weight : 0.50 (Cat HB)_ <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 2,550 Ibs/LCY Net correction : 0.111,8 <br />Weight description <br />Earth - Dry packed <br />JOB TIME AND COST <br />Fleet size : 1 Dozer(s) <br />Adjusted unit production : 205.80 LCY/hr <br />Adjusted fleet production : 205,.80 LCY/hr <br />Total job time : 2.07 Hours <br />Unit cost : $0.486 /LCY Total job cost : $207