Laserfiche WebLink
User <br />GRM <br />Site :Jubilee Venture _ Filename :P015-04a <br />Agency or organization name : DRMS <br />Permit or other job action :Final Reclamation Liability Estimate <br />Task description :Fill in Process Pond <br />HOURLY EQUIPMENT COST <br />Basic machine: Cat D6R - 6S (2003) Horsepower : 165 <br />Blade type :Straight <br />Attachment no. 1 :ROPS Cab Shift basis : 1 per day <br />Attachment no. 2 :3-shank ripper <br />volume : 75 LCY <br />factor : NA volume : 75 LCY <br />Source of estimated volume : submitted pond size <br />Source of estimated swell factor : NA <br /> <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br /> Operator skill : 0.75 (avg.) _ <br />Average push distance : 50 feet Material consistency : 1.20 (Cat HB) <br />Unadjusted hourly production : 444.6 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility : 1.00 (avg.) _ <br />Material consistency description : Job efficiency : 0.83 (1shift1day) <br />Loose stockpile Spoil pile: 0.80 (fnd-ro <br /> Push gradient : 1.07 (Cat HB) <br />Average push gradient : 3.00 % (neg) Altitude : 1.00 _(Cat HB) <br />Average site altitude : 700 feet Material weight : 0.71 (Cat HB)_ <br /> Blade type : 1.0,0 (S/SU/U) <br />Material weight : 3,250 Ibs/LCY Net correction : 0.45 <br />Weight description <br />Gravel - Pitrun Adjusted unit production : 201.04 LCY/hr <br /> Adjusted fleet production : 201.04 LCY/hr <br /> <br />JOB TIME AND COST <br />Fleet size : 1 Dozer(s) Total job time : 0.37 Hours <br />Unit cost : $0.499 /LCY Total job cost : $37